Facility Type | New or Conversion: Single story |
New or Conversion: Multiple story |
Addition or Remodeling |
Alzheimer's Certification |
---|---|---|---|---|
Small Type A (4 to 16 beds based on residential board and care occupancy of the Life Safety Code, Chapter 21-2 Slow) |
$1,950 | $2,250 | 3% of construction cost Minimum: $1,110 Maximum: 75% of the fee for a new facility of the same type |
Not applicable |
Large Type A (17 or more beds based on residential board and care of the Life Safety Code, Chapter 21-3) |
17-80 beds $2,250 |
17-80 beds $3,000 |
3% of construction cost Minimum: $1,200 Maximum: 75% of the fee for a new facility of the same type |
Not applicable |
81-120 beds: $3,000 |
81-120 beds: $3,800 |
|||
121+ beds: $25 per bed |
121+ beds: $32 per bed |
|||
Small Type B (4 to 16 beds based on residential board and care occupancy of the Life Safety Code, Chapter 21-2 Impractical) |
$2,250 | $3,000 | 3% of construction cost Minimum: $1,100 Maximum: 75% of the fee for a new facility of the same type |
$350 additional fee |
Large Type B (17 or more beds based on the health care occupancy of the Life Safety Code, Chapter 12) |
17-80 beds: $3,000 |
17-80 beds: $3,750 |
3% of construction cost Minimum: $1,350 Maximum: 75% of the fee for a new facility of the same type |
$550 additional fee |
81-120 beds: $3,800 |
81-120 beds: $4,550 |
|||
121+ beds: $32 per bed |
121+ beds: $38 per bed |