Figure: 30 TAC §290.113(a)(2)

Date to Start Stage 2 Compliance
This type of system: Must comply with Stage 2 starting:
Systems that are not part of a combined distribution system and systems that serve the largest population in the combined distribution system:
System serving 100,000 or more population April 1, 2012
System serving 50,000 to 99,999 population October 1, 2012
System serving 10,000 to 49,999 population October 1, 2013
System serving fewer than 10,000 population if
the system distributes only treated groundwater
or potable water purchased from another system
October 1, 2013
System serving fewer than 10,000 population
that treats surface water (or groundwater under
the direct influence of surface water) if no
Cryptosporidium monitoring is required under
§290.111(b)(3)(B) of this title (relating to
Surface Water Treatment)
October 1, 2013
System serving fewer than 10,000 population
that treats surface water (or groundwater under
the direct influence of surface water) if
Cryptosporidium monitoring is required under
§290.111(b)(3)(B) of this title
October 1, 2014
Systems of any population that are part of a combined distribution system:
Consecutive system or wholesale system that
is part of a combined distribution system
At the same time as the system with the
earliest compliance date in the combined
distribution system