TITLE 16ECONOMIC REGULATION
PART 1RAILROAD COMMISSION OF TEXAS
CHAPTER 3OIL AND GAS DIVISION
RULE §3.8Water Protection

        (II) the dimensions and maximum capacity of the pit; and

        (III) a signed statement that the operator has written permission from the surface owner of the tract upon which the pit is located for construction and use of the pit for such purpose.

      (vii) Equipment, machinery, waste, or other materials that could reasonably be expected to puncture, tear, or otherwise compromise the integrity of the liner shall not be used or placed in lined pits.

      (viii) The pit shall be inspected periodically by the operator for compliance with the applicable provisions of this section.

    (H) Backfill requirements.

      (i) A person who maintains or uses a reserve pit, mud circulation pit, fresh makeup water pit, fresh mining water pit, completion/workover pit, basic sediment pit, flare pit, non-commercial fluid recycling pit, or water condensate pit shall dewater, backfill, and compact the pit according to the following schedule.

        (I) Reserve pits and mud circulation pits which contain fluids with a chloride concentration of 6,100 mg/liter or less and fresh makeup water pits shall be dewatered, backfilled, and compacted within one year of cessation of drilling operations.

        (II) Reserve pits and mud circulation pits which contain fluids with a chloride concentration in excess of 6,100 mg/liter shall be dewatered within 30 days and backfilled and compacted within one year of cessation of drilling operations.

        (III) All completion/workover pits used when completing a well shall be dewatered within 30 days and backfilled and compacted within 120 days of well completion. All completion/workover pits used when working over a well shall be dewatered within 30 days and backfilled and compacted within 120 days of completion of workover operations.

        (IV) Basic sediment pits, flare pits, fresh mining water pits, non-commercial fluid recycling pits, and water condensate pits shall be dewatered, backfilled, and compacted within 120 days of final cessation of use of the pits.

        (V) If a person constructs a sectioned reserve pit, each section of the pit shall be considered a separate pit for determining when a particular section should be dewatered.

      (ii) A person who maintains or uses a reserve pit, mud circulation pit, fresh makeup water pit, non-commercial fluid recycling pit, or completion/workover pit shall remain responsible for dewatering, backfilling, and compacting the pit within the time prescribed by clause (i) of this subparagraph, even if the time allowed for backfilling the pit extends beyond the expiration date or transfer date of the lease covering the land where the pit is located.

      (iii) The director may require that a person who uses or maintains a reserve pit, mud circulation pit, fresh makeup water pit, fresh mining water pit, completion/workover pit, basic sediment pit, flare pit, non-commercial fluid recycling pit, or water condensate pit backfill the pit sooner than the time prescribed by clause (i) of this subparagraph if the director determines that oil and gas wastes or oil field fluids are likely to escape from the pit or that the pit is being used for improper storage or disposal of oil and gas wastes or oil field fluids.

      (iv) Prior to backfilling any reserve pit, mud circulation pit, completion/workover pit, basic sediment pit, flare pit, non-commercial fluid recycling pit, or water condensate pit whose use or maintenance is authorized by this paragraph, the person maintaining or using the pit shall, in a permitted manner or in a manner authorized by paragraph (3) of this subsection, dispose of all oil and gas wastes which are in the pit.

        (I) Unless otherwise approved by the district director after a showing that the fluids will be confined in the pit at all times, all authorized pits shall be constructed, used, operated, and maintained at all times outside of a 100-year flood plain as that term is defined in subsection (a) of this section. The operator may request a hearing if the district director denies approval of the request to construct a pit within a 100-year flood plain.

        (II) In the event of an unauthorized discharge from any pit authorized by this paragraph, the operator shall take any measures necessary to stop or control the discharge and report the discharge to the district office as soon as possible.

  (5) Responsibility for disposal.

    (A) Permit required. No generator or receiver may knowingly utilize the services of a carrier to transport oil and gas wastes if the carrier is required by this rule to have a permit to transport such wastes but does not have such a permit. No carrier may knowingly utilize the services of a second carrier to transport oil and gas wastes if the second carrier is required by this rule to have a permit to transport such wastes but does not have such a permit. No generator or carrier may knowingly utilize the services of a receiver to store, handle, treat, reclaim, or dispose of oil and gas wastes if the receiver is required by statute or commission rule to have a permit to store, handle, treat, reclaim, or dispose of such wastes but does not have such a permit. No receiver may knowingly utilize the services of a second receiver to store, handle, treat, reclaim, or dispose of oil and gas wastes if the second receiver is required by statute or commission rule to have a permit to store, handle, treat, reclaim, or dispose of such wastes but does not have such a permit. Any person who plans to utilize the services of a carrier or receiver is under a duty to determine that the carrier or receiver has all permits required by the Oil and Gas Division to transport, store, handle, treat, reclaim, or dispose of oil and gas wastes.

    (B) Improper disposal prohibited. No generator, carrier, receiver, or any other person may improperly dispose of oil and gas wastes or cause or allow the improper disposal of oil and gas wastes. A generator causes or allows the improper disposal of oil and gas wastes if:

      (i) the generator utilizes the services of a carrier or receiver who improperly disposes of the wastes; and

      (ii) the generator knew or reasonably should have known that the carrier or receiver was likely to improperly dispose of the wastes and failed to take reasonable steps to prevent the improper disposal.

  (6) Permits.

    (A) Standards for permit issuance. A permit to maintain or use a pit for storage of oil field fluids or oil and gas wastes may only be issued if the commission determines that the maintenance or use of such pit will not result in the waste of oil, gas, or geothermal resources or the pollution of surface or subsurface waters. A permit to dispose of oil and gas wastes by any method, including disposal into a pit, may only be issued if the commission determines that the disposal will not result in the waste of oil, gas, or geothermal resources or the pollution of surface or subsurface water. A permit to maintain or use any unlined brine mining pit or any unlined pit, other than an emergency saltwater storage pit, for storage or disposal of oil field brines, geothermal resource waters, or other mineralized waters may only be issued if the commission determines that the applicant has conclusively shown that use of the pit cannot cause pollution of surrounding productive agricultural land nor pollution of surface or subsurface water, either because there is no surface or subsurface water in the area of the pit, or because the surface or subsurface water in the area of the pit would be physically isolated by naturally occurring impervious barriers from any oil and gas wastes which might escape or migrate from the pit. Permits issued pursuant to this paragraph will contain conditions reasonably necessary to prevent the waste of oil, gas, or geothermal resources and the pollution of surface and subsurface waters. A permit to maintain or use a pit will state the conditions under which the pit may be operated, including the conditions under which the permittee shall be required to dewater, backfill, and compact the pit. Any permits issued pursuant to this paragraph may contain requirements concerning the design and construction of pits and disposal facilities, including requirements relating to pit construction materials, dike design, liner material, liner thickness, procedures for installing liners, schedules for inspecting and/or replacing liners, overflow warning devices, leak detection devices, and fences. However, a permit to maintain or use any lined brine mining pit or any lined pit for storage or disposal of oil field brines, geothermal resource waters, or other mineralized waters will contain requirements relating to liner material, liner thickness, procedures for installing liners, and schedules for inspecting and/or replacing liners.

    (B) Application. An application for a permit to maintain or use a pit or to dispose of oil and gas wastes shall be filed with the commission in Austin. The applicant shall mail or deliver a copy of the application to the appropriate district office on the same day the original application is mailed or delivered to the commission in Austin. A permit application shall be considered filed with the commission on the date it is received by the commission in Austin. When a commission-prescribed application form exists, an Cont'd...

Next Page Previous Page