Public Utility Commission of Texas
Figure: 16 TAC §25.261(c)(2)
RGC=(PP)(G) |
|
Where: |
|
RGC = |
Annual cost (in dollars) of replacement generating capacity |
PP = |
Purchased power price determined using commission-approved price projections. |
G = |
Amount of generation (megawatt-hour), which is the annual average of the output of the applicable electric generating facility for the three most current years as reported on Form EIA-767 or if not available on Form EIA-767, then the average annual output as reported to the commission, declining for the years 2004 and thereafter at the rate of 2.0% per year. |