Figure: 30 TAC §113.2070(21)(B)

C= Pv(4.5)
     8
 

where:

C = incinerator capacity measured in lb/hr

Pv = primary chamber volume measured in ft3

4.5 = waste density measured in lb/ft3

8 = typical hours of operation measured in hours