(a) Perform continuous emissions monitoring system
(CEMS) relative accuracy tests in accordance with 40 Code of Federal
Regulations (CFR) §60.105a(g)(2) for the Unit 29 FCCU Stack (EPN
29P1) and the Unit 40 FCCU Stack (EPN 40P1) and 40 CFR §60.106a(1)(iii)
for the SRU Incinerator (EPN 34I1) and the SCOT SRU Incinerator (EPN
43I1).
(b) Perform initial and subsequent testing of monitoring
devices required by §112.233 of this title (relating to Monitoring
Requirements) in accordance with the manufacturer's specifications
to ensure that the required monitoring instrumentation is calibrated
and functional. Initial testing must be completed by the compliance
date in §112.238 of this title (relating to Compliance Schedules).
If a monitoring device has been previously tested in accordance with
the manufacturer's specifications and a record is available to document
proper procedures were followed, then an owner or operator is not
required to repeat the initial testing again under §112.234(b)
provisions.
(c) Conduct additional performance testing, if requested
by the executive director, in compliance with 40 CFR §60.104a
to demonstrate compliance with applicable emission limits or standards.
The notification requirements of 40 CFR §60.8(d) apply to each
initial performance test and to each subsequent performance test required
by the executive director, except for performance tests conducted
for the purpose of obtaining supplemental data because of continuous
monitoring system breakdowns, repairs, calibration checks, or zero
and span adjustments. All performance tests must be conducted using
test methods allowed in §112.235 of this title (relating to Approved
Test Methods).
(d) When analysis of fuels, including but not limited
to refinery gas, is required under §112.233 of this title, the
owner or operator shall use a test method in §112.235 of this
title for the analysis.
|