(a) The owner or operator of any unit at a major source
of nitrogen oxides (NOX ) in the Dallas-Fort
Worth eight-hour ozone nonattainment area that is subject to §117.405(a)
or (b) of this title (relating to Emission Specifications for Reasonably
Available Control Technology (RACT)) or §117.410(a) of this title
(relating to Emission Specifications for Eight-Hour Attainment Demonstration)
shall submit an initial control plan. The control plan must include:
(1) a list of all combustion units at the account that
are listed in §117.405(a) or (b) or §117.410(a) of this
title. The list must include for each unit:
(A) the maximum rated capacity;
(B) anticipated annual capacity factor;
(C) estimated or measured NOX emission
data in the units associated with the category of equipment from §117.405(a)
or (b) or §117.410(a) of this title;
(D) the method of determination for the NOX emission data required by subparagraph (C)
of this paragraph;
(E) the facility identification number and emission
point number as submitted to the Emissions Assessment Section of the
commission; and
(F) the emission point number as listed on the Maximum
Allowable Emissions Rate Table of any applicable commission permit;
(2) identification of all units with a claimed exemption
from the emission specifications of §117.405(a) or (b) or §117.410(a)
of this title and the rule basis for the claimed exemption;
(3) identification of the election to use the source
cap emission limit as specified in §117.423 of this title (relating
to Source Cap) to achieve compliance with this rule and a list of
the units to be included in the source cap;
(4) a list of units to be controlled and the type of
control to be applied for all such units, including an anticipated
construction schedule;
(5) a list of units requiring operating modifications
to comply with §117.430(b) of this title (relating to Operating
Requirements) and the type of modification to be applied for all such
units, including an anticipated construction schedule;
(6) for units required to install totalizing fuel flow
meters in accordance with §117.440(a) of this title (relating
to Continuous Demonstration of Compliance), indication of whether
the devices are currently in operation, and if so, whether they have
been installed as a result of the requirements of this chapter; and
(7) for units required to install continuous emissions
monitoring systems or predictive emissions monitoring systems in accordance
with §117.440 of this title, indication of whether the devices
are currently in operation, and if so, whether they have been installed
as a result of the requirements of this chapter.
(b) The initial control plan must be submitted to the
Office of Compliance and Enforcement, the appropriate regional office,
and the Office of Air by the applicable date specified for initial
control plans in §117.9030 of this title (relating to Compliance
Schedule for Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area
Major Sources).
|