(a) The owner or operator of any unit at a major source
of nitrogen oxides (NOX ) in the Dallas-Fort
Worth eight-hour ozone nonattainment area that is subject to §117.1310
of this title (relating to Emission Specifications for Eight-Hour
Attainment Demonstration) shall submit an initial control plan. The
control plan must include:
(1) a list of all combustion units at the account that
are listed in §117.1310 of this title. The list must include
for each unit:
(A) the maximum rated capacity;
(B) anticipated annual capacity factor;
(C) estimated or measured NOX emission
data in the units associated with the category of equipment from §117.1310
of this title;
(D) the method of determination for the NOX emission data required by subparagraph (C)
of this paragraph;
(E) the facility identification number and emission
point number as submitted to the Emissions Assessment Section of the
commission; and
(F) the emission point number as listed on the Maximum
Allowable Emissions Rate Table of any applicable commission permit;
(2) identification of all units with a claimed exemption
from the emission specifications of §117.1310 of this title and
the rule basis for the claimed exemption;
(3) a list of units to be controlled and the type of
control to be applied for all such units, including an anticipated
construction schedule;
(4) for units required to install totalizing fuel flow
meters in accordance with §117.1340 of this title (relating to
Continuous Demonstration of Compliance), indication of whether the
devices are currently in operation, and if so, whether they have been
installed as a result of the requirements of this chapter; and
(5) for units required to install continuous emissions
monitoring systems or predictive emissions monitoring systems in accordance
with §117.1340 of this title, indication of whether the devices
are currently in operation, and if so, whether they have been installed
as a result of the requirements of this chapter.
(b) The initial control plan must be submitted to the
Office of Compliance and Enforcement, the appropriate regional office,
and the Office of Air by the applicable date specified for initial
control plans in §117.9130 of this title (relating to Compliance
Schedule for Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area
Utility Electric Generation Sources).
|