Each application shall contain maps and plans of the proposed
permit and adjacent areas as follows:
(1) The maps and plans shall show the lands proposed
to be affected throughout the operation and any change in a facility
or feature to be caused by the proposed operations, if the facility
or feature was shown under §§12.136 and 12.137 of this title
(relating to Maps: General Requirements, and to Cross Sections, Maps,
and Plans).
(2) The following shall be shown for the proposed permit
area unless specifically required for the permit and adjacent area
by the requirements of this section:
(A) buildings, utility corridors and facilities to
be used;
(B) the area of land to be affected within the proposed
permit area, according to the sequence of mining and reclamation;
(C) each area of land for which a performance bond
or other equivalent guarantee will be posted under Subchapter J of
this chapter (relating to Bond and Insurance Requirements for Surface
Coal Mining and Reclamation Operations);
(D) each coal storage, cleaning and loading area;
(E) each topsoil, spoil, coal waste, and noncoal waste
storage area;
(F) each water diversion, collection, conveyance, treatment,
storage, and discharge facility to be used;
(G) each air-pollution collection and control facility;
(H) each source of waste and each waste-disposal facility
relating to coal processing or pollution control;
(I) each facility to be used to protect and enhance
fish and wildlife and related environmental values;
(J) each explosive storage-and-handling facility; and
(K) location of each sedimentation pond, permanent
water impoundment, coal processing waste bank, and coal processing
waste dam and embankment, in accordance with §12.148 of this
title (relating to Reclamation Plan: Ponds, Impoundments, Banks, Dams,
and Embankments), and fill area for the disposal of excess spoil in
accordance with §12.153 of this title (relating to Disposal of
Excess Spoil).
(3) Except as provided in §12.148(a)(2) and (3)
of this title, §12.153(a) of this title (relating to Disposal
of Excess Spoil), §12.363(b) of this title (relating to Disposal
of Excess Spoil: General Requirements), §12.366(b)(1) of this
title (relating to Disposal of Excess Spoil: Durable Rock Fills),
and §12.368(c) of this title (relating to Coal Processing Waste
Banks: General Requirements), maps, plans, and cross-sections required
under paragraph (2)(D), (E), (F), (J), and (K) of this section shall
be prepared by, or under the direction of, and certified by a qualified
professional engineer, or qualified professional geoscientist, with
assistance from experts in related fields such as land surveying and
landscape architecture.
(4) A description of and plans and drawings for each
support facility to be constructed, used, or maintained within the
proposed permit area. The plans and drawings shall include a map,
appropriate cross sections, design drawings, and specifications sufficient
to demonstrate compliance with §12.403 of this title (relating
to Support Facilities) for each facility.
|
Source Note: The provisions of this §12.142 adopted to be effective April 7, 1997, 22 TexReg 3093; amended to be effective November 4, 1997, 22 TexReg 10640; amended to be effective December 28, 2020, 45 TexReg 9503 |