(a) Upon completion of the construction of a collection
system or wastewater treatment facility, an owner shall provide a
completion notice to the executive director that:
(1) is signed, sealed, and dated by an engineer;
(2) certifies that the completed work complies with
this chapter, the approved plans and specifications, any approved
variances, any approved substantial design changes, and the associated
wastewater permit; and
(3) states that an operation and maintenance manual,
as required in §217.16 of this title (relating to Wastewater
Treatment Facility Operation and Maintenance Manual), has been prepared
and a copy is located at the wastewater treatment facility.
(b) An owner shall disclose in a completion notice
any deviation from the approved plans and specifications that is incorporated
into a project after construction began or from an approved substantial
design change. An owner shall retain an engineer to review design
changes and to certify, based on best professional judgment, all substantial
design changes were submitted for approval, as substantial design
change is defined in §217.12(a) of this title (relating to Substantial
Design Changes).
|