(a) An aquifer recharge (AR) project operator shall
monitor each AR injection well associated with an AR project. By no
later than March 1 of each calendar year, the project operator shall
provide the executive director a written report of the following information
for the previous year:
(1) the volume of water injected for recharge; and
(2) other information as determined by the executive
director as necessary for the protection of underground sources of
drinking water.
(b) At least on an annual basis and each time the source
changes, an AR project operator shall perform water-quality testing
on water to be injected at an AR injection well. All environmental
laboratory analyses shall be performed by laboratories accredited
under the Texas Laboratory Accreditation Program using National Environmental
Laboratory Accreditation Conference standards. Within 60 days of sampling,
the AR project operator shall provide to the executive director a
written report of the results of this testing. The report shall include
the test results for all water-quality parameters identified in the
individual permit, general permit, or authorization by rule.
|