RULE §5.206Permit Standards

  (1) Plan. The operator must maintain and comply with the approved emergency and remedial response plan required by §5.203(l) of this title. The operator must update the plan in accordance with §5.207(a)(2)(D)(vi) of this title (relating to Reporting and Record-Keeping). The operator must make copies of the plan available at the storage facility and at the company headquarters. The emergency and remedial response plan and the demonstration of financial responsibility must account for the AOR delineated as specified in §5.203(d)(1)(A) - (C) of this title or the most recently evaluated AOR delineated under subsection (g) of this section, regardless of whether or not corrective action in the AOR is phased.

  (2) Training.

    (A) The operator must prepare and implement a plan to train and test each employee at the storage facility on occupational safety and emergency response procedures to the extent applicable to the employee's duties and responsibilities. The operator must make copies of the plan available at the geological storage facility. The operator must train all employees before commencing injection and storage operations at the facility. The operator must train each subsequently hired employee before that employee commences work at the storage facility.

    (B) The operator must hold a safety meeting with each contractor prior to the commencement of any new contract work at a storage facility. The operator must explain emergency measures specific to the contractor's work in the contractor safety meeting.

    (C) The operator must provide training schedules, training dates, and course outlines to Commission personnel annually and upon request for the purpose of Commission review to determine compliance with this paragraph.

  (3) Action.

    (A) If an operator obtains evidence that the injected CO2 stream and associated pressure front may cause an endangerment to USDWs, the operator must:

      (i) immediately cease injection;

      (ii) take all steps reasonably necessary to identify and characterize any release;

      (iii) notify the director as soon as practicable but within at least 24 hours; and

      (iv) implement the approved emergency and remedial response plan.

    (B) If any water quality monitoring of a USDW indicates the movement of any contaminant into the USDW, except as authorized by an aquifer exemption, the director shall prescribe such additional requirements for construction, corrective action, operation, monitoring, or reporting, including plugging of the injection well, as are necessary to prevent such movement.

  (4) Resumption of injection. The director may allow the operator to resume injection prior to remediation if the operator demonstrates that the injection operation will not endanger USDWs.

(i) Permit conditions for Commission witnessing of testing and logging. The operator must provide the division with the opportunity to witness all planned well workovers, stimulation activities, other than stimulation for formation testing, and testing and logging. The operator must submit a proposed schedule of such activities to the Commission at least 30 days prior to conducting the first such activity and submit notice at least 48 hours in advance of any actual activity. Such activities shall not commence before the end of the 30 days unless authorized by the director.

(j) Permit conditions for well plugging. The operator of a geologic storage facility must maintain and comply with the approved well plugging plan required by §5.203(k) of this title.

(k) Permit conditions for post-injection storage facility care and closure.

  (1) Post-injection storage facility care and closure plan.

    (A) The operator of an injection well must maintain and comply with the approved post-injection storage facility care and closure plan.

    (B) The operator must update the plan in accordance with §5.207(a)(2)(D)(vi) of this title. At any time during the life of the geologic sequestration project, the operator may modify and resubmit the post-injection site care and site closure plan for the director's approval within 30 days of such change. Any amendments to the post-injection site care and site closure plan must be approved by the director, be incorporated into the permit, and are subject to the permit modification requirements in §5.202 of this title, as appropriate.

    (C) Upon cessation of injection, the operator of a geologic storage facility must either submit an amended plan or demonstrate to the director through monitoring data and modeling results that no amendment to the plan is needed.

  (2) Post-injection storage facility monitoring. Following cessation of injection, the operator must continue to conduct monitoring as specified in the approved plan until the director determines that the position of the CO2 plume and pressure front are such that the geologic storage facility will not endanger USDWs.

  (3) Prior to closure. Prior to authorization for storage facility closure, the operator must demonstrate to the director, based on monitoring, other site-specific data, and modeling that is reasonably consistent with site performance that no additional monitoring is needed to assure that the geologic storage facility will not endanger USDWs. The operator must demonstrate, based on the current understanding of the site, including monitoring data and/or modeling, all of the following:

    (A) the estimated magnitude and extent of the facility footprint (the CO2 plume and the area of elevated pressure);

    (B) that there is no leakage of either CO2 or displaced formation fluids that will endanger USDWs;

    (C) that the injected or displaced fluids are not expected to migrate in the future in a manner that encounters a potential leakage pathway into USDWs;

    (D) that the injection wells at the site completed into or through the injection zone or confining zone will be plugged and abandoned in accordance with these requirements; and

    (E) any remaining facility monitoring wells will be properly plugged or are being managed by a person and in a manner approved by the director.

  (4) Notice of intent for storage facility closure. The operator must notify the director in writing at least 120 days before storage facility closure. At the time of such notice, if the operator has made any changes to the original plan, the operator also must provide the revised plan. The director may approve a shorter notice period.

  (5) Authorization for storage facility closure. No operator may initiate storage facility closure until the director has approved closure of the storage facility in writing. After the director has authorized storage facility closure, the operator must plug all wells in accordance with the approved plan required by §5.203(k) of this title and submit a plugging record (Form W-3) as required by §3.14 of this title (relating to Plugging).

  (6) Storage facility closure report. Once the director has authorized storage facility closure, the operator must submit a storage facility closure report within 90 days that must thereafter be retained by the Commission in Austin. The report must include the following information:

    (A) documentation of appropriate injection and monitoring well plugging. The operator must provide a copy of a survey plat that has been submitted to the Regional Administrator of Region 6 of the EPA. The plat must indicate the location of the injection well relative to permanently surveyed benchmarks including the Latitude/Longitude or X/Y coordinates of the surface location in the NAD 27, NAD 83, or WGS 84 coordinate system, a labeled scale bar, and northerly direction arrow;

    (B) documentation of appropriate notification and information to such state and local authorities as have authority over drilling activities to enable such state and local authorities to impose appropriate conditions on subsequent drilling activities that may penetrate the injection and confining zones; and

    (C) records reflecting the nature, composition, volume and mass of the CO2 stream. If mass is determined using volume, the operator must provide calculations.

  (7) Certificate of closure. Upon completion of the requirements in paragraphs (3) - (6) of this subsection, the director will issue a certificate of closure. At that time, the operator is released from the requirement in §5.205(c) of this title to maintain financial assurance.

(l) Permit conditions for deed notation. The operator of a geologic storage facility must record a notation on the deed to the facility property; on any other document that is normally examined during title search; or on any other document that is acceptable to the county clerk for filing in the official public records of the county that will in perpetuity provide any potential purchaser of the property the following information:

  (1) a complete legal description of the affected property;

Cont'd...