You must:
(1) Complete the notice requirements in §745.5051
of this subchapter (relating to What notice and approval is required
for a voluntary action?);
(2) Prior to a planned temporary relocation:
(A) Obtain any inspections at the temporary location
that are identified in the applicable minimum standards, which may
include fire, sanitation, and gas leak inspections;
(B) Ensure the temporary location complies with applicable
licensing statutes, rules, and minimum standards;
(C) Allow us to conduct an inspection under §745.5103
of this division (relating to What actions will Licensing take after
receiving a notice that you are temporarily relocating?); and
(D) Obtain our approval for any aspect of the temporary
location that does not comply with the applicable licensing statutes,
rules, and minimum standards; and
(3) For an emergency relocation:
(A) Complete each step in paragraph (1) of this section
as soon as possible after the relocation; and
(B) If you are a residential child care operation,
meet any additional reporting and documentation requirements under:
(i) §748.303(e)(1) and (3) of this title (relating
to When must I report and document a serious incident?); or
(ii) §749.503(e)(1) and (3) of this title (relating
to When must I report and document a serious incident?).
|