<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 10COMMUNITY DEVELOPMENT
PART 1TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS
CHAPTER 11QUALIFIED ALLOCATION PLAN (QAP)
SUBCHAPTER DUNDERWRITING AND LOAN POLICY
RULE §11.305Environmental Site Assessment Rules and Guidelines

(a) General Provisions. The Environmental Site Assessments (ESA) prepared for the Department must be conducted and reported in conformity with the standards of the American Society for Testing and Materials (ASTM). The initial report must conform with the Standard Practice for Environmental Site Assessments: Phase I Assessment Process (ASTM Standard Designation: E1527-13 or any subsequent standards as published). Any subsequent reports should also conform to ASTM standards and such other recognized industry standards as a reasonable person would deem relevant in view of the Property's anticipated use for human habitation. The ESA shall be conducted by a Third Party environmental professional at the expense of the Applicant, and addressed to the Department as a User of the report (as defined by ASTM standards). Copies of reports provided to the Department which were commissioned by other financial institutions must either address Texas Department of Housing and Community Affairs as a co-recipient of the report or letters from both the provider and the recipient of the report may be submitted extending reliance on the report to the Department. The ESA report must also include a statement that the person or company preparing the ESA report will not materially benefit from the Development in any other way than receiving a fee for performing the ESA, and that the fee is in no way contingent upon the outcome of the assessment. The report must also include the following statement, "any person signing this Report acknowledges that the Department may publish the full report on the Department's website, release the report in response to a request for public information and make other use of the report as authorized by law." The ESA report must contain a statement indicating the report preparer has read and understood the requirements of this section.

(b) In addition to ASTM requirements, the report must:

  (1) State if a noise study is recommended for a property in accordance with current HUD guidelines and identify its proximity to industrial zones, major highways, active rail lines, civil and military airfields, or other potential sources of excessive noise;

  (2) Provide a copy of a current survey, if available, or other drawing of the site reflecting the boundaries and adjacent streets, all improvements on the site, and any items of concern described in the body of the ESA or identified during the physical inspection;

  (3) Provide a copy of the current FEMA Flood Insurance Rate Map showing the panel number and encompassing the site with the site boundaries precisely identified and superimposed on the map;

  (4) If the subject Development Site includes any improvements or debris from pre-existing improvements, state if testing for Lead Based Paint or asbestos containing materials would be required pursuant to local, state, and federal laws, or recommended due to any other consideration;

  (5) State if testing for lead in the drinking water would be required pursuant to local, state, and federal laws, or recommended due to any other consideration such as the age of pipes and solder in existing improvements. For all Rehabilitation Developments, the ESA provider must state whether the on-site plumbing is a potential source of lead in drinking water;

  (6) Assess the potential for the presence of Radon on the Development Site, and recommend specific testing if necessary;

  (7) Identify and assess the presence of oil, gas or chemical pipelines, processing facilities, storage facilities or other potentially hazardous explosive activities (does not include liquified petroleum gas containers with a capacity of less than 125 gallons on-site or within 0.25 miles of the site that could potentially adversely impact the Development. Location of these items must be shown on a drawing or map in relation to the Development Site and all existing or future improvements. The drawing must depict any blast zones (in accordance with HUD guidelines) and include HUD blast zone calculations; and

  (8) Include a vapor encroachment screening in accordance with the ASTM "Standard Guide for Vapor Encroachment Screening on Property Involved in Real Estate Transactions" (E2600-10 or any subsequent standards as published).

(c) If the report recommends further studies or establishes that environmental hazards currently exist on the Property, or are originating off-site, but would nonetheless affect the Property, the Development Owner must act on such a recommendation, or provide a plan for either the abatement or elimination of the hazard. Evidence of action or a plan for the abatement or elimination of the hazard must be presented upon Application submittal.

(d) For Developments in programs that allow a waiver of the Phase I ESA such as an existing USDA funded Development, the Development Owners are hereby notified that it is their responsibility to ensure that the Development is maintained in compliance with all state and federal environmental hazard requirements.

(e) Those Developments which have or are to receive first lien financing from HUD may submit HUD's environmental assessment report, provided that it conforms to the requirements of this section.


Source Note: The provisions of this §11.305 adopted to be effective December 31, 2023, 48 TexReg 7887

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page