<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 16ECONOMIC REGULATION
PART 1RAILROAD COMMISSION OF TEXAS
CHAPTER 11SURFACE MINING AND RECLAMATION DIVISION
SUBCHAPTER CSUBSTANTIVE RULES--URANIUM EXPLORATION AND SURFACE MINING
DIVISION 5URANIUM EXPLORATION PERMITS AND PERMIT FEES
RULE §11.134Uranium Exploration Permit Renewal

(a) A permittee shall apply for a permit renewal by filing with the division a completed Form SMRD-3U (Application to Conduct Uranium Exploration Activities by Drilling) at least 30 days prior to the expiration of the permit term and paying the Commission the applicable fee or fees as required by §11.136 of this title (relating to Uranium Exploration Permit Fees). In the renewal application, the permittee shall describe all revisions that are proposed for the exploration activity or reclamation. The director shall issue the renewal permit based on the written findings by the director that:

  (1) the permittee is meeting the terms and conditions of the existing permit; and

  (2) the permittee has provided any additional or revised information required by the director.

(b) A permittee shall file an application for renewal of its uranium exploration permit if the permittee has not met the requirements of §11.131(h) of this title (relating to Uranium Exploration Permit: General Provisions).


Source Note: The provisions of this §11.134 adopted to be effective November 1, 2010, 35 TexReg 9724

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page