<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 16ECONOMIC REGULATION
PART 1RAILROAD COMMISSION OF TEXAS
CHAPTER 4ENVIRONMENTAL PROTECTION
SUBCHAPTER BCOMMERCIAL RECYCLING
DIVISION 2REQUIREMENTS FOR ON-LEASE COMMERCIAL SOLID OIL AND GAS WASTE RECYCLING
RULE §4.214Minimum Design and Construction Information

A permit application for on-lease commercial solid oil and gas waste recycling shall include:

  (1) the typical layout and design of receiving, processing, and storage areas and all equipment (e.g., pug mill), tanks, silos, and dikes.

  (2) a description of the type and thickness of liners (e.g., fiberglass, steel concrete), if any, for all tanks, silos, pits, and storage areas/cells;

  (3) a map view and two perpendicular cross-sectional views of typical pits and/or storage areas/cells to be constructed, showing the bottom, sides, and dikes, showing the dimensions of each; and

  (4) a plan to control and manage storm water runoff and to retain wastes during wet weather, including the location and dimensions of dikes and/or storage basins that would collect storm water during a 25-year, 24-hour maximum rainfall event, and all calculations made to determine the required capacity and design.


Source Note: The provisions of this §4.214 adopted to be effective April 15, 2013, 38 TexReg 2334

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page