(a) A contractor must submit for review an application
and plans for the installation of new equipment.
(b) To apply for a plan review for the installation
of new equipment, a contractor must:
(1) submit a completed application on a department-approved
form;
(2) pay the fee required by §74.80; and
(3) submit layout drawings as specified in the ASME
Code A17.1 adopted in §74.100 for the specific type of equipment
to be installed. These layout drawings shall also include:
(A) the rated speed of the equipment in feet per minute;
(B) the rated capacity of the equipment in pounds;
(C) the total travel of the equipment in feet and inches;
(D) elevation drawings of the hoistway, runway or wellway;
and
(E) plan drawings indicating the arrangement of the
equipment in a machine room, machine space, control room or control
space.
|