(a) If the installation or alteration has already been
completed, any changes to an approved application and plans for the
installation of new equipment or the alteration of existing equipment
must be resubmitted in accordance with §74.111 or §74.112.
(b) If the installation or alteration has not been
completed, a contractor may amend a previously approved application
and plans for the installation of new equipment or the alteration
of existing equipment.
(c) To apply for a plan review of any amendments to
a previously approved plan review under subsection (b), a contractor
must:
(1) submit a completed application on a department-approved
form;
(2) pay the fee required by §74.80; and
(3) submit a written description of the scope of work
which shall include a description of each alteration to be performed.
(d) In addition to submitting the items under subsection
(c), a contractor must submit layout drawings as specified in §74.111(b)(3)
and the ASME Code A17.1 adopted in §74.100 for the specific type
of equipment, if the alteration described in subsection (c)(3) results
in one or more of the following changes:
(1) the rated speed of the equipment in feet per minute;
(2) the rated capacity of the equipment in pounds;
(3) the total travel of the equipment in feet and inches;
(4) the classification of the equipment, such as passenger
elevator to freight elevator or freight elevator to passenger elevator;
or
(5) the driving machine is re-located.
|