<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 30ENVIRONMENTAL QUALITY
PART 1TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
CHAPTER 115CONTROL OF AIR POLLUTION FROM VOLATILE ORGANIC COMPOUNDS
SUBCHAPTER DPETROLEUM REFINING, NATURAL GAS PROCESSING, AND PETROCHEMICAL PROCESSES
DIVISION 1PROCESS UNIT TURNAROUND AND VACUUM-PRODUCING SYSTEMS IN PETROLEUM REFINERIES
RULE §115.312Control Requirements

(a) For all affected persons in the Beaumont/Port Arthur, Dallas/Fort Worth, El Paso, and Houston/ Galveston areas, the following control requirements shall apply.

  (1) Volatile organic compound (VOC) emissions from petroleum refineries shall be controlled during process unit shutdown or turnaround with the following procedure:

    (A) recover and store all pumpable or drainable liquid; and

    (B) reduce vessel gas pressure to 5.0 pounds per square inch gauge (psig) (34.5 kPa gauge) or less by recovery or combustion before venting to the atmosphere.

  (2) Vent gas streams affected by §115.311(a) of this title (relating to Emission Specifications) must be controlled properly with a control efficiency of at least 90% or to a VOC concentration of no more than 20 parts per million by volume (ppmv) (on a dry basis corrected to 3.0% oxygen for combustion devices):

    (A) in a direct-flame incinerator at a temperature equal to or greater than 1,300 degrees Fahrenheit (704 degrees Celsius);

    (B) in a smokeless flare; or

    (C) by any other vapor control system, as defined in §115.10 of this title (relating to Definitions).

  (3) In the Houston/Galveston area, the following are subject to the requirements of Subchapter H of this chapter (relating to Highly-Reactive Volatile Organic Compounds) in addition to the applicable requirements of this division (relating to Process Unit Turnaround and Vacuum-Producing Systems in Petroleum Refineries):

    (A) any vent gas stream which is subject to §115.311(a) of this title and which includes a HRVOC, as defined in §115.10 of this title; and

    (B) any process unit shutdown or turnaround of a unit in which a HRVOC is a raw material, intermediate, final product, or in a waste stream.

(b) For all affected persons in Gregg, Nueces, and Victoria Counties, the following control requirements shall apply.

  (1) VOC emissions from petroleum refineries shall be controlled during process unit shutdown or turnaround with the following procedure:

    (A) recover and store all pumpable or drainable liquid; and

    (B) reduce vessel gas pressure to five psig (34.5 kPa gauge) or less by recovery or combustion before venting to the atmosphere.

  (2) Vent gas streams affected by §115.311(b) of this title must be controlled properly with a control efficiency of at least 90% or to a VOC concentration of no more than 20 ppmv (on a dry basis corrected to 3.0% oxygen for combustion devices):

    (A) in a direct-flame incinerator at a temperature equal to or greater than 1,300 degrees Fahrenheit (704 degrees Celsius);

    (B) in a smokeless flare; or

    (C) by any other vapor control system, as defined in §115.10 of this title.


Source Note: The provisions of this §115.312 adopted to be effective February 19, 1990, 15 TexReg 549; amended to be effective August 1, 1992, 17 TexReg 4683; amended to be effective May 22, 1997, 22 TexReg 4213; amended to be effective May 16, 2002, 27 TexReg 4113; amended to be effective January 17, 2003, 28 TexReg 113

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page