(a) Certification by licensed professional engineer.
The operator shall obtain certification by a Texas-Licensed Professional
Engineer that the facility has been constructed as designed and in
general compliance with the regulations prior to accepting any feedstock
at the facility that requires a permit. The operator shall maintain
that certification on-site for inspection by the commission.
(b) Ownership or control of property. The facility
shall be located on property owned by the operator or the operator
shall establish, using an affidavit form provided by the commission,
signed by the owner and notarized, that the owner is aware of and
consents to the operation prior to any receipt of feedstock or processing
activities. A copy of the affidavit shall be kept on-site at all times.
(c) Inspection of facility. Prior to the initial acceptance
of any feedstocks, the facility shall be inspected by the agency to
determine compliance with the permit.
|