RULE §332.47Permit Application Preparation

To assist the commission in evaluating the technical merits of a compost facility, an applicant subject to this chapter shall submit a site development plan to the commission along with a compost permit application form provided by the executive director. The site development plan must be sealed by a Texas-licensed professional engineer in accordance with the provisions of 22 TAC §137.33 (relating to Engineers' Seals). The site development plan must contain all of the following information.

  (1) Title page. A title page shall show the name of the project, the county (and city if applicable) in which the proposed project is located, the name of the applicant, the name of the engineer, the date the application was prepared, and the latest date the application was revised.

  (2) Table of contents. A table of contents shall be included which lists the main sections of the plan, any requested variances, and page numbers.

  (3) Engineer's appointment. The site development plan shall contain an engineer's appointment, which consists of a letter from the applicant to the executive director identifying the consulting engineering firm responsible for the submission of the plan, specifications, and any other technical data to be evaluated by the commission regarding the project.

  (4) Land use. To assist the executive director in evaluating the impact of the facility on the surrounding area, the applicant shall provide the following:

    (A) a description of the zoning at the facility and within one mile of the facility. If the facility requires approval as a nonconforming use or a special use permit from the local government having jurisdiction, a copy of such approval shall be submitted with the application;

    (B) a description of the character of the surrounding land uses within one mile of the proposed facility;

    (C) proximity to residences and other uses (e.g., schools, churches, cemeteries, historic structures, historic sites, archaeologically significant sites, sites having exceptional aesthetic quality, parks, recreational sites, recreational facilities, licensed day care centers, etc.). Give the approximate number of residences and business establishments within one mile of the proposed facility including the distances and directions to the nearest residences and businesses;

    (D) a discussion that shows the facility is compatible with the surrounding land uses; and

    (E) a constructed land use map showing the land use, zoning, residences, businesses, schools, churches, cemeteries, historic structures, historic sites, archaeologically significant sites, sites having exceptional aesthetic quality, licensed day care centers, parks, recreational sites and recreational facilities within one mile of the facility, and wells within 500 feet of the facility.

  (5) Access. To assist the executive director in evaluating the impact of the facility on the surrounding roadway system, the applicant shall provide the following:

    (A) data on the roadways within one mile of the facility used to access the facility. The data shall include dimensions, surfacing, general condition, capacity, and load limits;

    (B) data on the volume of vehicular traffic on access roads within one mile of the proposed facility. The applicant shall include both existing and projected traffic during the life of the facility (for projected include both traffic generated by the facility and anticipated increase without the facility);

    (C) an analysis of the impact the facility will have on the area roadway system, including a discussion on any mitigating measures (turning lanes, roadway improvements, intersection improvements, etc.) proposed with the project; and

    (D) an access roadway map showing all area roadways within a mile of the facility. The data and analysis required in subparagraphs (A) - (C) of this paragraph shall be keyed to this map.

  (6) Facility development. To assist the executive director in evaluating the impact of the facility on the environment, the applicant shall provide the following.

    (A) Surface water protection plan. The surface water protection plan shall be prepared by a licensed professional engineer. At a minimum, the applicant shall provide all of the following:

      (i) a design for a run-on control system capable of preventing flow onto the facility during the peak discharge from at least a 25-year, 24-hour rainfall event;

      (ii) a design for a runoff management system to collect and control at least the peak discharge from the facility generated by a 25-year, 24-hour rainfall event;

      (iii) a design for a contaminated water collection system to collect and contain all leachate. If the design uses leachate for any processing, the applicant shall clearly demonstrate that such use will not result in contamination of the final product; and

      (iv) drainage calculations as follows.

        (I) Calculations for areas of 200 acres or less shall follow the rational method as specified in the Texas Department of Transportation Bridge Division Hydraulic Manual.

        (II) Calculations for discharges from areas greater than 200 acres shall be computed by using United States Geological Survey (USGS) hydraulic equations compiled by the USGS and the Texas Department of Transportation Bridge Division Hydraulic Manual, the HEC-1 and HEC-2 computer programs developed through the Hydrologic Engineering Center of the United States Army Corps of Engineers, or an equivalent or better method approved by the executive director.

        (III) Calculations for sizing containment facilities for leachate shall be determined by a mass balance based on the facility's proposed leachate disposal method.

        (IV) Temporary and permanent erosion control measures shall be discussed;

      (v) drainage maps and drainage plans shall be provided as follows:

        (I) an off-site topographic drainage map showing all areas that contribute to the facility's run-on. The map shall delineate the drainage basins and sub-basins, show the direction of flow, time of concentration, basin area, rainfall intensity, and flow rate. This map shall also show all creeks, rivers, intermittent streams, lakes, bayous, bays, estuaries, arroyos, and other surface waters in the state;

        (II) a pre-construction on-site drainage map. The map shall delineate the drainage basins and sub-basins, show the direction of flow, time of concentration, basin area, rainfall intensity and flow rate;

        (III) a post-construction on-site drainage map. The map shall delineate the drainage basins and sub-basins, show the direction of flow, time of concentration, basin area, rainfall intensity, and flow rate;

        (IV) a drainage facilities map. The map shall show all proposed drainage facilities (ditches, ponds, piping, inlets, outfalls, structures, etc.) and design parameters (velocities, cross-section areas, grades, flowline elevations, etc.). Complete cross-sections of all ditches and ponds shall be included;

        (V) a profile drawing. The drawing shall include profiles of all ditches and pipes. Profiles shall include top of bank, flowline, hydraulic grade, and existing groundline. Ditches and swells shall have a minimum of one foot of freeboard;

        (VI) a floodplain and wetlands map. The map shall show the location and lateral extent of all floodplains and wetlands on the site and on lands within 500 feet of the site; and

        (VII) an erosion control map which indicates placement of erosion control features on the site.

    (B) Geologic/hydrogeologic report. The geologic/hydrogeologic report shall be prepared by an engineer or qualified geologist/hydrogeologist. The applicant shall include discussion and information on all of the following:

      (i) a description of the regional geology of the area. This section shall include:

        (I) a geologic map of the region with text describing the stratigraphy and lithology of the map units. An appropriate section of a published map series such as the Geologic Atlas of Texas prepared by The University of Texas at Austin's Bureau of Economic Geology is acceptable;

        (II) a description of the generalized stratigraphic column in the facility area from the base of the lowermost aquifer capable of providing usable groundwater, or from a depth of 1,000 feet, whichever is less, to the land surface. The geologic age, lithology, variation in lithology, thickness, depth geometry, hydraulic conductivity, and depositional history of each geologic unit should be described based upon available geologic information;

      (ii) a description of the geologic processes active in the vicinity of the facility. This description shall include an identification of any faults and/or subsidence in the area of the facility;

      (iii) a description of the regional aquifers in the vicinity of the facility based upon published and open-file sources. The section shall provide: