<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 43TRANSPORTATION
PART 1TEXAS DEPARTMENT OF TRANSPORTATION
CHAPTER 21RIGHT OF WAY
SUBCHAPTER MQUARRY AND PIT SAFETY
RULE §21.707Barrier Construction Standards

(a) A barrier required under §21.706 of this subchapter must be determined by the department to be sufficient to prevent the normal passage of vehicular traffic from entering the site of the pit.

(b) The design of the barrier must be approved by the department to insure proper performance.

(c) The barrier may be a guardrail, concrete barrier, or berm barrier. A guardrail must meet the current department specification and standard detail for metal beam guard fence. A concrete barrier must meet the current department specifications and standards for a rigid barrier and the appropriate standards for end treatments, attenuators, and crash cushion. A berm barrier must meet the current department specifications and standards for berm barriers.

(d) A barrier that was determined to conform to construction standards for the issuance of a safety certificate and that has deteriorated so that it no longer meets the construction standards applicable at the time the safety certificate was issued will be required to be improved to conform to those standards.


Source Note: The provisions of this §21.707 adopted to be effective January 7, 2009, 34 TexReg 69

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page