(a) Before the department will provide route information
to the Texas Department of Motor Vehicles for the issuance of the
oversize and overweight permit for a superheavy load, the department
must receive from an engineering firm certified under this subchapter
a written report that includes a detailed structural analysis of the
bridges on the proposed route demonstrating that the bridges and culverts
on the route are capable of sustaining the load.
(b) The report must be submitted in the form prescribed
by the department.
(c) Failure to submit a report in the prescribed form
may result in non-consideration of the analysis.
|