RULE §25.381Capacity Auctions

    (D) Activity rules for affiliated PGCs in non-ERCOT areas.

      (i) A bidder must bid in the first round for a particular entitlement to participate in subsequent rounds.

      (ii) A bidder may not bid a greater quantity than it bid in a previous round for a particular entitlement.

    (E) Mechanism for auction for affiliated PGCs in non-ERCOT areas. Each affiliated PGC shall conduct the auction over the Internet on a secure web page and shall assign a password and bidder's number to each entity that has satisfied the credit requirements in this section.

  (7) Establishment of opening bid price.

    (A) If an affiliated PGC intends to change the minimum opening bid prices that would otherwise be applicable under subparagraph (B) of this paragraph, it shall file with the commission, not less than 90 days before the auction start date on which the change is proposed to be applicable, a methodology for determining an opening bid price for each type of entitlement, if needed, based on the affiliated PGC's expected variable cost of operation, but excluding any return on equity. The opening price may not include any cost included in the fuel price to be paid by entitlement holders, nor any cost being recovered by its affiliated transmission and distribution utility through non-bypassable delivery charges, but may recover variable costs not included in the fuel prices, such as fuel service costs and start up fees. Parties shall have 30 days after filing to challenge the methodology. If no challenges are received, the affiliated PGC's proposed methodology shall be deemed appropriate. If any party objects to the affiliated PGC's proposed methodology, then the commission shall determine the appropriate methodology.

    (B) Minimum opening bids for entitlements shall be the same as the minimum opening bids used in the most recent auction that included those entitlements, except that sellers with plants that have been affected by congestion zone changes since the most recent auction may use minimum opening bids that are different than the minimum opening bids in the most recent auction, provided that the seller maintains the same weighted- average, by MW, of the most recent auction's minimum bids, for all of its plants of the same product type in all congestion zones, to compute the new minimum opening bids for each product type. Nothing in this subparagraph shall prevent the commission from ordering a different methodology for a seller, if the seller proves that good cause exists for the change.

    (C) In the notice provided pursuant to paragraph (2)(B)(i) of this subsection, the affiliated PGC may make available an opening bid price calculated pursuant to the commission-approved methodology for each type of entitlement to be offered for sale at auction. The affiliated PGC shall not be obligated to accept any bid for a product less than the opening bid price, but shall notify the commission that the opening bid price was not met. The affiliated PGC shall be deemed to have met the 15% requirement if it offered products in a product category (for example, gas-intermediate) and successfully sold, at least, all of the entitlements offered in one particular month, in that product category. If there is an auction where there is no month in which all of the entitlements of a particular product are sold, then the affiliated PGC shall, in its notice pursuant to paragraph (2)(B)(i) of this subsection, make a proposal to the commission in order to comply with the 15% requirement. The affiliated PGC's proposal may include revisions to the product category, product price, or offer alternative products for auction.

  (8) Results of the auction. The results of the auction shall be simultaneously announced to all bidders by posting on the affiliated PGC's auction web site with posting of the market clearing price for each set of entitlements.

(i) Resale of entitlement.

  (1) Compliance with provisions. An entitlement may be assigned, sold or transferred by the entitlement holder only by following the provisions of this section. Any purported assignment, sale, or transfer of an entitlement that does not follow the provisions of this section is void and ineffective against the affiliated PGC.

  (2) Eligible entities. An entitlement holder may assign, sell, or transfer an entitlement to any person or entity other than an affiliated REP, but the entitlement holder may dispatch the output of the entitlement to an affiliated REP.

  (3) Obligations. An entitlement that is assigned, sold, or transferred under this section remains subject to the provisions of the Agreement under which it originated, and the assignee of that entitlement succeeds to all of the rights and obligations of the assignor with respect to that entitlement.

  (4) Liability. Neither the assignor nor any previous entitlement holder that has remained liable for payments due to the affiliated PGC in connection with the entitlement as a result of a previous assignment, sale, or transfer is released from liability to the affiliated PGC for payments due in connection with the entitlement unless:

    (A) At least 14 days before the effective date of the assignment, sale, or transfer, assignee has provided security to the affiliated PGC that is equal to or greater than the security originally given to the affiliated PGC for the entitlement; and

    (B) At least ten days before the effective date of the assignment, sale, or transfer, the affiliated PGC has notified both assignor and assignee in writing that the security has been approved and accepted by the affiliated PGC.

  (5) Requests to approve security. The affiliated PGC shall respond to written requests to approve security to be offered by a prospective assignee within 14 days after receipt of that request. Approval shall not be unreasonably withheld.

  (6) Effective date. No assignment, transfer, or sale of the entitlement by a party is binding on the non-assigning party until the non-assigning party receives written notice of the assignment, sale, or transfer and a copy of the executed assignment, sale, or transfer document, and the assignment, sale, or transfer is not effective unless such notice is received at least three days before the beginning of the entitlement month.

(j) True-up process.

  (1) Process. For 2002 and 2003, the affiliated PGC shall reconcile, and either credit or bill to the transmission and distribution utility, any difference between the price of power obtained through the capacity auctions under this section and the power cost projections that were employed for the same time period in the ECOM model to estimate stranded costs for the affiliated PGC in the PURA §39.201 proceeding.

  (2) PGCs without stranded costs. An affiliated PGC that does not have stranded costs described by PURA §39.254 is not required to comply with paragraph (1) of this subsection.

  (3) Any order by the commission that finally resolves an affiliated PGC's stranded costs, prior to true-up, supersedes this subsection.

(k) True-up process for electric utilities with divestiture. If an affiliated PGC meets its capacity auction requirements through a divestiture as allowed by subsection (d) of this section, the proceeds of the divestiture shall be used for purposes of the true-up calculation.

(l) Modification of auction procedures or products. Upon a finding by the commission that the auction procedures or products require modification to better value the products or to better suit the needs of the competitive market, the commission may, by order, modify the procedures or products detailed in this section.

(m) Contract terms.

  (1) Standard agreement. Parties shall utilize the Agreement in the form prepared by the Edison Electric Institute (Version 2.1). The Cover Sheet to the Agreement shall provide for credit terms that are based upon objective credit standards determined by the commission. There may be different versions of the Agreement applicable to sales of capacity auction products in different regions in Texas. For example, ERCOT and the non-ERCOT areas may have different versions of the Agreement.

  (2) Applicability. The terms and conditions set forth in any Agreement apply only to the entitlements obtained in the capacity auctions under this section.

  (3) Electronic scheduling. The Agreement shall require that, if the affiliated PGC provides an electronic scheduling interface for the dispatch of entitlements, then the entitlement holder shall schedule the dispatch of its entitlements using that electronic interface.

  (4) Scheduling discrepancies. If an entitlement holder submits a non-conforming schedule to the affiliated PGC for an entitlement that violates any of the scheduling requirements for that capacity auction product type for a scheduled hour, then the schedule for that hour is deemed to be the same as the schedule for the hour most closely preceding that scheduled hour that was not a non- conforming schedule. The affiliated PGC shall promptly notify the entitlement holder of a non-conforming schedule. However, the requirements of this paragraph are subject to the default scheduling requirements for baseload and gas- intermediate products delineated in subsections (f)(3)(A)(iv)(V) and (f)(4)(A)(v) of this section for ERCOT Cont'd...