RULE §213.5Required Edwards Aquifer Protection Plans, Notification, and Exemptions

      (i) Main line stub outs. Manholes must be placed at the end of all sewer lines that will be extended at a future date, as specified in §317.2(c)(5) of this title. If the main line is to be extended within one year, a variance to allow the use of a stub out until the line is extended will be considered on a case-by-case basis. At the time of original construction, new stub outs must be constructed sufficiently to extend beyond the end of the street pavement. Stub outs that were not anticipated at the time of original construction must enter the manhole using a bored or drilled hole. Chiseling or hammering to enter a manhole is prohibited.

      (ii) Private service lateral stub outs. Such stub outs must be manufactured using wyes or tees that are compatible in size and material with both the sewer line and the extension. Private service lateral stub outs that were not anticipated at the time of original construction must be connected using a manufactured saddle in accordance with accepted plumbing techniques.

    (H) Locating sewer lines within a five-year floodplain. Sewer lines may not be located within the five-year floodplain of a drainageway, unless an exemption is granted by the executive director. If the applicant demonstrates to the executive director that such location is unavoidable, and the area is subject to inundation and stream velocities which could cause erosion and scouring of backfill, the trench must be capped with concrete to prevent scouring of backfill, or the sewer lines must be encased in concrete. All concrete must have a minimum thickness of six inches.

    (I) Inspection of private service lateral connections. After installing and prior to covering and connecting a private service lateral to an organized sewage collection system, a Texas licensed professional engineer, Texas registered sanitarian, or appropriate city inspector must inspect the private service lateral and the connection to the collection system and certify that construction conforms with the applicable provisions of this subsection and local plumbing codes. Private service laterals may only be connected to approved sewage collection systems.

    (J) Embedment materials. Embedment materials must meet the specification for bedding contained in §317.2(a)(5) of this title.

    (K) Sewer lines bridging caverns or other sensitive features. Sewer lines that bridge caverns or sensitive features must be constructed in a manner that will maintain the structural integrity of the line. When such geologic features are encountered during construction, the location and extent of those features must be assessed by a geologist and must be reported to the appropriate regional office in writing within two working days of discovery. Notification and inspection must comply with the requirements under subsection (f) of this section.

    (L) Erosion and sedimentation control. A temporary erosion and sedimentation control plan must be included with all construction plans. All temporary erosion and sedimentation controls must be installed prior to construction, must be maintained during construction, and must be removed when sufficient vegetation is established to control the erosion and sedimentation and the construction area is stabilized.

    (M) Alternative sewage collection systems. The executive director may approve an alternative procedure which is technically justified; signed, sealed, and dated by a Texas licensed professional engineer indicating equivalent environmental protection; and which complies with the requirements of §317.2(d) of this title.

    (N) Required corrective action. Notwithstanding compliance with the requirements of subparagraphs (A) - (M) of this paragraph, sewage collection systems must operate in a manner that will not cause pollution of the Edwards Aquifer. Any failure must be corrected in a manner satisfactory to the executive director.

  (4) Contents of organized sewage collection system plan.

    (A) Application. For organized sewage collection systems, the information required under §213.4 of this title must be filed with the executive director at the appropriate regional office.

    (B) Narrative description of proposed organized sewage collection system. A narrative report must include, at a minimum, a geographic description and anticipated type of development within the sewage collection system service area.

    (C) Geologic assessment. A geologic assessment, as described in subsection (b)(3) of this section, must be performed by a geologist along the path of the proposed sewer line(s), plus 50 feet on each side of the proposed sewer line(s). The geologic assessment report must be signed, sealed, and dated by the geologist preparing the report.

    (D) Technical report. For an organized sewage collection system, a technical report must be submitted on forms provided by, or approved by, the executive director. The technical report must contain the information requested in the following subsections of this section: (b)(4)(A)(ii) and (iv), (B), (D)(i), (F)(i), and (G). A technical report for a water pollution abatement plan submitted under subsection (b) of this section satisfies this requirement, provided it properly addresses the proposed sewage collection system.

    (E) Plans and specifications. Plans and specifications addressing all the requirements in paragraphs (2) and (3) of this subsection, must include at a minimum:

      (i) a map showing the location of the organized sewage collection system layout in relation to recharge zone boundaries;

      (ii) a map showing the location of the organized sewage collection system layout overlaid by topographic contour lines, using a contour interval of not greater than ten feet, and showing the area within both the five-year floodplain and the 100-year floodplain of any drainage way;

      (iii) construction documents prepared by, or under the supervision of, a Texas licensed professional engineer, which have also been signed, sealed, and dated by that Texas licensed professional engineer, at a minimum, must include:

        (I) plan and profile views of the collection system;

        (II) construction details of collection system components;

        (III) specifications for all collection system components; and

        (IV) proposed pollution abatement measures for sensitive features identified along the path of the proposed sewer line.

(d) Static hydrocarbon and hazardous substance storage in underground storage tanks system.

  (1) Standards for underground storage tank systems. New or replacement systems for the underground storage of static hydrocarbons or hazardous substances must be of double-walled or an equivalent method approved by the executive director. Methods for detecting leaks in the inside wall of a double-walled system must be included in the facility's design and construction. The leak detection system must provide continuous monitoring of the system and must be capable of immediately alerting the system's owner of possible leakages.

    (A) Installation. All underground hydrocarbon and hazardous substance storage tank systems must be installed by a person possessing a valid certificate of registration in accordance with the requirements of Chapter 334, Subchapter I of this title (relating to Underground Storage Tank On-Site Supervisor Licensing and Contractor Registration).

    (B) Siting. Any new underground hydrocarbon and hazardous substance storage tank system that does not incorporate a method for tertiary containment must be located a minimum horizontal distance of 150 feet from any domestic, industrial, or irrigation well, or other sensitive feature as determined under the geologic assessment at the time of construction or replacement under paragraph (2)(C) of this subsection or the tankhold inspection under subsection (f)(2)(B) of this section. This method of tertiary containment also applies to the placement of a tank system within 150 feet of a public water supply well without a sanitary control easement of 150 feet as defined in §290.41(c)(1)(F) of this title (relating to Water Sources).

  (2) Contents of an underground storage tank facility plan. An underground storage tank facility plan must, at a minimum, contain the following information.

    (A) Application. The information required under §213.4 of this title must be filed with the executive director at the appropriate regional office.

    (B) Site location map. A site location map as specified in subsection (b)(2) of this section including a legible road map, a general location map, and a site plan, must be submitted as part of the plan.

    (C) Geologic assessment. For all facilities located on either the recharge zone or transition zone, a geologic assessment prepared by a geologist, as described in subsection (b)(3) of this section, must be submitted for the site. The geologic assessment report must be signed, sealed, and dated by the geologist preparing the report.