(D) a description of how the groundwater monitoring program will demonstrate the adequacy of the corrective action; and (E) a schedule for submittal of the information required in subparagraphs (C) and (D) of this paragraph provided the owner or operator obtains written authorization from the executive director prior to submittal of the complete permit application. (g) Landfill gas management plan. A facility gas management plan shall be prepared to address all of the requirements in Subchapter I of this chapter (relating to Landfill Gas Management). (h) Closure plan. The facility closure plan shall be prepared in accordance with Subchapter K of this chapter (relating to Closure and Post-Closure). For a landfill unit, the closure plan will include a contour map showing the final constructed contour of the entire landfill to include internal drainage and side slopes plus accommodation of surface drainage entering and departing the completed fill area plus areas subject to flooding due to a 100-year frequency flood. Cross-sections shall be provided. (i) Post-closure plan. The facility post-closure care plan shall be prepared in accordance with Subchapter K of this chapter. (j) Cost estimate for closure and post-closure care. The owner or operator shall submit a cost estimate for closure and post-closure care in accordance with Subchapter L of this chapter (relating to Closure, Post-Closure, and Corrective Action Cost Estimates). For an existing facility, the owner or operator shall also submit a copy of the documentation required to demonstrate financial assurance as specified in Chapter 37, Subchapter R of this title (relating to Financial Assurance for Municipal Solid Waste Facilities). For a new facility, a copy of the required documentation shall be submitted 60 days prior to the initial receipt of waste. |