<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 30ENVIRONMENTAL QUALITY
PART 1TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
CHAPTER 114CONTROL OF AIR POLLUTION FROM MOTOR VEHICLES
SUBCHAPTER GTRANSPORTATION PLANNING
RULE §114.260Transportation Conformity

analysis of the MTP and TIP. The MPO shall consult with project sponsors to determine the non-federal projects' location and design concept and scope to be used in the regional emissions analysis, particularly for projects that the sponsor does not report a single intent because the sponsor's alternatives selection process is not yet complete. If the MPO assumes a design concept and scope that is different from the sponsor's ultimate choice, the next regional emissions analysis for a conformity determination must reflect the most recent information regarding the project's design concept and scope;

      (ix) ensure timely TCM implementation and report on the implementation and emissions reductions status of adopted TCMs annually to the commission;

      (x) cooperatively share the responsibility for conducting conformity determinations on transportation activities that cross the borders of MPOs or nonattainment and maintenance areas. The affected MPOs will enter into a Memorandum of Agreement (MOA) that will define the effective boundary and the respective responsibilities of each MPO for regional emissions analysis. The MPOs will be responsible within their respective metropolitan area boundaries and, at their option, beyond to the boundaries of the nonattainment/maintenance areas, for regional emissions analysis. Adjacent MPOs or nonattainment/maintenance areas or basins will share information concerning air quality modeling assumptions and emission rates that affect both areas; and

      (xi) for the purpose of determining the conformity of all projects outside the metropolitan planning area, but within the nonattainment or maintenance area, enter into an MOA involving the MPO and TxDOT for cooperative planning and analysis of projects.

    (B) The commission, as the lead air quality planning agency, shall work in consultation with the agencies specified in paragraph (1)(A) of this subsection in developing applicable transportation-related SIP revisions, air quality modeling, general emissions analysis, emissions inventory, and all related activities. Specifically, the commission shall:

      (i) set agendas and schedule meetings to seek advice and comments from all agencies specified in paragraph (1)(A) of this subsection during preparation of applicable transportation-related SIP revisions;

      (ii) schedule public hearings in order to gather public input on the applicable transportation-related SIP revisions in accordance with 40 CFR §51.102 and notify the agencies specified in paragraph (1)(B) of this subsection of the hearings;

      (iii) provide copies of final documents, including applicable adopted or approved transportation-related SIP revisions and supporting information, to all agencies specified in paragraph (1)(B) of this subsection;

      (iv) after consultation with the MPO regarding TCMs, distribute to all agencies specified in paragraph (1)(B) of this subsection and other interested persons the list of TCMs proposed for inclusion in the SIP. In consultation with the agencies specified in paragraph (1)(A) of this subsection, the commission shall determine whether past obstacles to implementation of TCMs have been identified and are being overcome, and determine whether the MPOs and the implementing agencies are giving maximum priority to approval or funding for TCMs. Also, the commission shall consider, in consultation with the affected agencies, whether delays in TCM implementation necessitate a SIP revision to remove TCMs or to substitute TCMs or other emission reduction measures; and

      (v) consult with the applicable agencies specified in paragraph (1)(A) of this subsection, in order to cooperatively choose conformity tests and methodologies for isolated rural nonattainment and maintenance areas, as required by 40 CFR §93.109(l)(2)(iii).

    (C) Any group, entity, or individual planning to construct a regionally significant transportation project that is not an FHWA-FTA project (including projects for which alternative locations, design concept and scope, or the no-build option are still being considered) shall disclose project plans to the MPO on a regular basis and disclose any changes to those plans immediately. This requirement also applies to recipients of funds designated under 23 USC or the federal transit laws.

  (3) General procedures.

    (A) The MPO, TxDOT, or the commission, as applicable, shall respond to comments of affected agencies on MTPs, TIPs, projects, or SIP revisions in accordance with the public participation procedures that govern the involved action. The MPO, TxDOT, or the commission, as applicable, shall include all comments and the replies to those comments with final documents when they are submitted for adoption by the agency's governing board. In the event that comments are not adequately resolved, the procedures outlined in paragraph (4) of this subsection regarding conflict resolution apply.

    (B) Because the validity of the regional emissions analysis depends on transportation modeling assumptions that need periodic updates, the MPO, with the assistance of TxDOT and local publicly owned transit agencies, will conduct meetings with the agencies specified in paragraph (1)(A) of this subsection to cooperatively establish research and data collection efforts and regional model development (e.g., household/transportation surveys).

    (C) For the purposes of evaluating and choosing a model (or models) and associated methods and assumptions to be used in hot spot and regional emissions analyses, agencies specified in paragraph (1)(A) of this subsection shall participate in a working group. The frequency of meetings and agendas for them will be cooperatively determined by the agencies specified in paragraph (1)(A) of this subsection.

    (D) The commission, affected MPOs, affected local air quality agencies, and TxDOT shall cooperatively evaluate events that will trigger the need for new conformity determinations. New conformity determinations may be triggered by events established in 40 CFR §93.104 as well as other events, including emergency relief projects that require substantial functional, locational, and capacity changes, or in the event of any other unforeseeable circumstances.

    (E) The MPO and its governing body, or TxDOT if applicable, shall make conformity determinations for all MTPs, TIPs, regionally significant projects, and all other events as required by 40 CFR Part 93, Subpart A and this section. Upon completion of the transportation conformity determination review process (including consultation, public participation, and all other requirements of this section), FHWA and FTA will issue a joint conformity finding, indicating the transportation conformity status of the document(s) under review. The effective date of the conformity determination for an area is the date of the joint conformity finding made by FHWA-FTA.

  (4) Conflict resolution.

    (A) The commission and the MPO (or TxDOT where appropriate) shall make a good-faith effort to address the major concerns of the other party in the event they are unable to reach agreement on the conformity determination of a proposed MTP or TIP. The efforts must include meetings of the agency executive directors, if necessary.

    (B) In the event that the MPO or TxDOT determines that every effort has been made to address the commission's concerns, and that no further progress is possible, the MPO or TxDOT shall notify the commission's executive director in writing to this effect. This subparagraph must be cited by the MPO or TxDOT in any notification of a conflict that may require action by the governor, or his or her delegate under subparagraph (C) of this paragraph.

    (C) The commission has 14 calendar days from date of receipt of notification, as required in subparagraph (B) of this paragraph, to appeal to the governor. If the commission appeals to the governor, the final conformity determination must then have the concurrence of the governor. The governor may delegate his or her role in this process, but not to the commission or commission staff, a local air quality agency, the Texas Transportation Commission or TxDOT staff, or an MPO. This subparagraph must be cited by the commission in any notification of a conflict that may require action by the governor or his or her delegate. If the commission does not appeal to the governor within 14 calendar days from receipt of written notification, the MPO or TxDOT may proceed with the final conformity determination.

  (5) Public comment on conformity determinations. Consistent with the requirements of 23 CFR Part 450, concerning public participation, the agencies making conformity determinations on transportation plans, programs, and projects must establish a proactive public participation process that provides opportunity for public review and comment. Any charges imposed for public inspection and copying should be consistent with the fee schedule contained in 49 CFR §7.43. In addition, these agencies shall address in writing any public comment claiming that a non-FHWA/FTA funded, regionally significant project has not been properly represented in the conformity determination for an MTP or TIP. Finally, these agencies shall provide opportunity for public involvement in conformity determinations for projects where otherwise required by law.

Cont'd...

Next Page Previous Page

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page