RULE §336.1129Technical Requirements

to the atmosphere.

(x) For impoundments containing uranium by-product materials, the final radon barrier shall be completed as expeditiously as practicable considering technological feasibility after the pile or impoundment ceases operation in accordance with a written reclamation plan, as defined in §336.1105(25) of this title, approved by the agency, by license amendment. (The term "As expeditiously as practicable considering technological feasibility" includes "Factors beyond the control of the licensee.") Deadlines for completion of the final radon barrier and applicable interim milestones shall be established as license conditions. Applicable interim milestones may include, but are not limited to, the retrieval of windblown by-product material and placement on the pile and the interim stabilization of the by-product material (including dewatering or the removal of freestanding liquids and recontouring). The placement of erosion protection barriers or other features necessary for long-term control of the by-product material shall also be completed in a timely manner in accordance with a written reclamation plan approved by the agency by license amendment.

(y) The agency may approve by license amendment a licensee's request to extend the time for performance of milestones related to emplacement of the final radon barrier if, after providing an opportunity for public participation, the agency finds that the licensee has adequately demonstrated in the manner required in subsection (r) of this section that releases of radon-222 do not exceed an average of 20 pCi/m2 s. If the delay is approved on the basis that the radon releases do not exceed 20 pCi/m2 s, a verification of radon levels, as required by subsection (r) of this section, shall be made annually during the period of delay. In addition, once the agency has established the date in the reclamation plan for the milestone for completion of the final radon barrier, the agency may by license amendment extend that date based on cost if, after providing an opportunity for public participation, the agency finds that the licensee is making good faith efforts to emplace the final radon barrier, the delay is consistent with the definition of "Available technology," and the radon releases caused by the delay will not result in a significant incremental risk to the public health.

(z) The agency may authorize by license amendment, upon licensee request, a portion of the impoundment to accept uranium by-product material, or such materials that are similar in physical, chemical, and radiological characteristics to the uranium mill tailings and associated wastes already in the pile or impoundment, from other sources during the closure process. No such authorization will be made if it results in a delay or impediment to emplacement of the final radon barrier over the remainder of the impoundment in a manner that will achieve levels of radon-222 releases not exceeding 20 pCi/m2 s averaged over the entire impoundment. The verification required in subsection (r) of this section may be completed with a portion of the impoundment being used for further disposal if the agency makes a final finding that the impoundment will continue to achieve a level of radon-222 release not exceeding 20 pCi/m2 s averaged over the entire impoundment. After the final radon barrier is complete except for the continuing disposal area, only by-product material will be authorized for disposal, and the disposal will be limited to the specified existing disposal area. This authorization by license amendment will only be made after providing opportunity for public participation. Reclamation of the disposal area, as appropriate, must be completed in a timely manner after disposal operations cease in accordance with subsection (p) of this section. These actions are not required to be complete as part of meeting the deadline for final radon barrier construction.

(aa) The licensee's closure plan must provide reasonable assurance that institutional control will be provided for the length of time found necessary by the agency to ensure the requirements of subsection (p) of this section are met.

(bb) Prior to any major site construction, a preoperational monitoring program must be conducted for one full year to provide complete baseline data on the site and its environs. Throughout the construction and operating phases of the project, an operational monitoring program must be conducted to measure or evaluate compliance with applicable standards and rules; to evaluate performance of control systems and procedures; to evaluate environmental impacts of operation; and to detect potential long-term effects.

(cc) The licensee shall establish a detection monitoring program needed for the agency to set the site-specific groundwater protection standards in subsection (j)(4) of this section. For all monitoring under this paragraph, the licensee or applicant will propose, as license conditions for agency approval, which constituents are to be monitored on a site-specific basis. The data and information must provide a sufficient basis to identify those hazardous constituents that require concentration limit standards and to enable the agency to set the limits for those constituents and compliance period. They may provide the basis for adjustments to the point of compliance. The detection monitoring program must be in place when specified by the agency in orders or license conditions. Once groundwater protection standards have been established in accordance with subsection (j)(4) of this section, the licensee shall establish and implement a compliance monitoring program. In conjunction with a corrective action program, the licensee shall establish and implement a corrective action monitoring program to demonstrate the effectiveness of the corrective actions. Any monitoring program required by this subsection may be based on existing monitoring programs to the extent the existing programs can meet the stated objective for the program.

(dd) Systems must be designed and operated so that all airborne effluent releases are as low as is reasonably achievable. The primary means of accomplishing this must be by means of emission controls. Institutional controls, such as extending the site boundary and exclusion area, may be employed to ensure that offsite exposure limits are met, but only after all practicable measures have been taken to control emissions at the source.

  (1) During operations and prior to closure, radiation doses from radon emissions from surface impoundments of by-product materials must be kept as low as is reasonably achievable.

  (2) Checks must be made and logged hourly of all parameters which determine the efficiency of emission control equipment operation. It must be determined whether or not conditions are within a range prescribed to ensure that the equipment is operating consistently near peak efficiency. Corrective action must be taken when performance is outside of prescribed ranges. Effluent control devices must be operative at all times during drying and packaging operations and whenever air is exhausting from the uranium dryer stack. Drying and packaging operations must terminate when controls are inoperative. When checks indicate the equipment is not operating within the range prescribed for peak efficiency, actions must be taken to restore parameters to the prescribed range. When this cannot be done without shutdown and repairs, drying and packaging operations must cease as soon as practicable. Operations may not be restarted after cessation due to off-normal performance until needed corrective actions have been identified and implemented. All such cessations, corrective actions, and re-starts must be reported to the executive director in writing within ten days of the subsequent restart.

  (3) To control dusting from by-product material, that portion not covered by standing liquids must be wetted or chemically stabilized to prevent or minimize blowing and dusting to the maximum extent reasonably achievable. This requirement may be relaxed if by-product materials are effectively sheltered from wind, as in the case of below-grade disposal. Consideration must be given in planning by-product material disposal programs to methods for phased covering and reclamation of by-product material impoundments. To control dusting from diffuse sources, applicants/licensees must develop written operating procedures specifying the methods of control that will be utilized.

  (4) Uranium recovery facility operations producing or involving thorium by-product material must be conducted in such a manner as to provide reasonable assurance that the annual dose equivalent does not exceed 25 millirems (mrem) to the whole body, 75 mrem to the thyroid, and 25 mrem to any other organ of any member of the public as a result of exposures to the planned discharge of radioactive materials to the general environment, radon-220 and its daughters excepted.

  (5) By-product materials must be managed so as to conform to the applicable provisions of 40 CFR Part 440, as codified on January 1, 1983.

Cont'd...