RULE §330.7Permit Required

    (G) Buffers and easements. The county or municipality maintains a minimum distance of 50 feet as a buffer between the permit boundary and waste storage, processing and disposal areas. No disposal occurs within a utility or pipeline easement or within 25 feet of the center of a utility or pipeline easement.

    (H) Below-grade placement. Waste is placed only below grade. The top of final cover is placed at pre-existing grade or up to three feet above pre-existing grade to ensure that natural drainage patterns are not altered and ponding of water over waste is prevented.

    (I) Weekly cover. Waste is covered at least weekly with six inches of earthen material not previously mixed with waste, or by tarps. Use of tarps as cover is limited to a seven-day period after which the county or municipality must replace the tarp with either waste or a six-inch layer of earthen material not previously mixed with waste. Tarps may not be used in place of soil cover requirements relating to non-RACM and RACM in subparagraph (E)(ii) and (iii) of this paragraph. Any trench that has received waste but will be inactive for more than 180 days receives intermediate cover in accordance with subparagraph (J) of this paragraph, or final cover in accordance with subparagraph (P) of this paragraph.

    (J) Intermediate cover. Waste is covered, including any soil weekly cover, with twelve inches of well compacted earthen material not previously mixed with waste.

    (K) Maximum volume. The design waste disposal volume is less than 2.5 million cubic meters in accordance with §106.534(3) of this title (relating to Municipal Solid Waste Landfills and Transfer Stations).

    (L) Facility signs. At all entrances through which waste is received, the facility conspicuously displays a sign with letters at least three inches in height providing a statement that the facility is "NOT FOR PUBLIC USE," an emergency 24-hour contact number that reaches an individual with the authority to obligate the facility at all times that the facility is not in operation, and the local emergency fire department number.

    (M) Stormwater and contaminated water. The county or municipality constructs berms to divert the 25-year/24-hour storm event from entering excavations containing waste. Water that has contacted waste is managed as contaminated water and disposed at an authorized treatment facility.

    (N) Reporting. The county or municipality, while not required to provide quarterly reporting, provides annual reporting in accordance with the annual reporting provisions of §330.675(a) of this title (relating to Reports).

    (O) Reauthorization. Before reaching the permit by rule term limit of five years, the county or municipality may request reauthorization under the permit by rule by submitting a form that is current at the time of reauthorization, provided by the commission in accordance with subparagraph (A) of this paragraph, to the executive director at least 14 days before the end of the permit term.

    (P) Final cover. The following conditions are met.

      (i) Within 60 days after a trench reaches its capacity or waste deposition activities are complete in a trench, the county or municipality installs final cover over waste in the trench. Final cover shall be composed of no less than two feet of soil. The first 18 inches or more of cover shall be of compacted clayey soil, classification sand clay (SC) or low plasticity clay (CL) as defined in the "Unified Soils Classification System" developed by the United States Army Corps of Engineers, and placed and compacted in layers of no more than six inches to minimize the potential for water infiltration. A high plasticity clayey (CH) soil may be used; however, this soil may experience excessive cracking and shall therefore be covered by a minimum of 12 inches of topsoil to retain moisture. Other types of soil may be used with prior written approval from the executive director. The final six inches of cover shall be of suitable topsoil that is capable of sustaining native plant growth and shall be seeded or sodded as soon as practicable following the application of the final cover in order to minimize erosion.

      (ii) The trench final cover procedures listed in clause (i) of this subparagraph are completed before facility closure, as described in subparagraph (Q) of this paragraph. If these procedures cannot be performed before the permit by rule term limit is reached, the county or municipality submits a current application form for reauthorization of the permit by rule to the executive director at least 14 days before the end of the permit term.

    (Q) Facility closure. The county or municipality notifies the executive director and the applicable regional office at least 60 days before the anticipated closure date of the facility. Within ten days after closure, submit to the executive director by registered mail a certified copy of an "affidavit to the public" in accordance with the requirements of §330.19 of this title (relating to Deed Recordation). In addition, record a certified notation of the deed to the facility property, or on some other instrument that is normally examined during title search, that will in perpetuity notify any potential purchaser of the property that the land has been used as a landfill facility and use of the land is restricted. Submit a certified deed to the executive director.

  (2) Other provisions. The following provisions also apply to this authorization.

    (A) Processing. This permit by rule also authorizes the processing of waste destined for the disposal unit. Authorized processing is limited to volume reduction, such as chipping or grinding, but not burning. Processing must occur within the permit boundary and may not occur within a buffer zone or right-of-way. Tires, RACM and non-RACM may not be processed. If required, the county or municipality must obtain authorization for air emissions resulting from this processing.

    (B) Fees. Waste that is disposed under this authorization is not subject to the fee requirements of Subchapter P of this chapter.

    (C) Other requirements. No other requirements under this chapter are applicable to a facility that meets all the requirements of this subsection.


Source Note: The provisions of this §330.7 adopted to be effective March 27, 2006, 31 TexReg 2502; amended to be effective August 16, 2012, 37 TexReg 6072; amended to be effective July 31, 2014, 39 TexReg 5796