RULE §317.15Appendix G--General Guidelines for the Design of Constructed Wetlands Units for Use in Municipal Wastewater Treatment

    (A) Inlets. All treatment units shall have multiple inlets (a minimum of three) and provide a method to mitigate erosion of the media.

    (B) Outlets. All treatment units shall have multiple outlets (a minimum of three). FWS outlets shall be submerged and be able to exclude floating detrital material and scum.

    (C) Water levels. The design should allow inlets and outlets to be raised and lowered, so that water levels within the basin can similarly be varied and provide the ability to flood the beds when necessary.

    (D) Basin hydraulic design.

      (i) Submerged flow systems (SFS). SFS systems should be designed to prevent surface ponding of wastewater. The hydraulic loading of these systems should be limited to the effective hydraulic capacity of the media in place. This effective hydraulic capacity will be a function of the clean media's hydraulic capacity reduced by root intrusion, slime layer, detritus, algae, and other blockages.

      (ii) Free water surface systems. FWS systems should be designed to prevent scour, erosion, and plant damage during peak flow periods. The hydraulic loading of these systems should be limited to the open channel carrying capacity of the unit at full growth.

  (11) Flow equalization. Flow to the units shall provide for a uniform environment and growth conducive to wetlands.

  (12) Initial vegetation spacing. Plants should be placed no greater than 66 inches apart (center to center). All plants to be used should be healthy, insect free, and undamaged. A broad diversity of plant species within any unit is recommended.

  (13) Total suspended solids (TSS) removal. The TSS removal efficiency of the wetland system is dependent on the quiescence of the system. However, if the facility is unable to meet its permitted parameters, alternate means of solids removal must be pursued.

  (14) Nitrification. Current wetland technology has not proven the ability to consistently nitrify typical domestic strength sewage to meet average permit limitations below 5.0 mg/liter. The design of any wetland proposed for use in this type situation will incorporate a separate nitrification process.

  (15) Harvesting. Harvesting of dead wetland vegetation and detritus plant matter is recommended.

(c) Submerged flow system design.

  (1) Basic design parameters. SFS wetlands are sized according to primary and/or secondary treatment efficiency preceding the units, i.e., fraction of remaining five-day biochemical oxygen demand (BOD5 ), and the permitted 30-day average effluent discharge concentration of BOD5 . The following factors shall be considered in the selection of the design hydraulic and organic loadings: strength of the influent sewage, effectiveness of primary and/or secondary treatment, type of media, ambient wastewater temperature for winter conditions, and treatment efficiency required.

    (A) Rock/media design. The following are minimum requirements for material specifications of the rock media.

      (i) Crushed rock, slag, or similar media should not contain more than 5.0% by weight of pieces whose longest dimension is three times its least dimension. The rock media should be free from thin, elongated, and flat pieces and should be free from clay, sand, organic material, or dirt. The media should have a Morhs hardness of at least 5.0.

      (ii) Rock media, except for the top planting layer, should conform to the following size distribution and gradation when mechanically graded over a vibrating screen with square openings:

        (I) passing six-inch sieve--100% by weight;

        (II) retained on two-inch sieve--90% to100% by weight;

        (III) passing one-inch sieve--less than 0.1% by weight.

    (B) Installation of the rock media.

      (i) Rock media shall be rinsed or washed to remove sediment. This washing should be sufficient to remove any significant amounts of dirt or accumulated debris.

      (ii) The proper placement and installation of media is vital to the success of the system. Undue compaction exerted on the media's surface, as it is installed and after its installation, can fracture and consolidate the media. The introduction of foreign fine particles and fracturing can adversely affect the system's hydraulic conductivity. Therefore, the following guidelines are recommended.

        (I) A layer of smaller rock (0.5 - 1.0 inches) may be used on the top of the unit to ease planting of the vegetation and aid in vector control.

        (II) Media should be gently put in place, avoiding excessive dropping, jostling, and abusive handling.

        (III) Heavy machinery should not be allowed on the surface of the media after final placement. If machinery is allowed on the surface, all tire ruts should be smoothed over to prevent ponding in ruts.

        (IV) Provisions should be made prior to planting to provide water and nutrients to the plants if the system start-up will be delayed.

  (2) Organic loadings. The following tables present typical ranges for detention time within the system in days. Each detention time represents combinations of different classes of secondary and advanced secondary treatment and different effluent parameters. Design engineers may submit sufficient operating data for similar installations, and/or actual field conditions to justify their efficiency calculations. These times represent the theoretical detention time of wastewater within the basin. Therefore, the amount of detention volume available is equal to the basin's volume multiplied by the average porosity of the media. Evapotranspiration and precipitation should also be considered when calculating detention time. The tables are based upon an average effective porosity media of 32%, and an average wastewater treatment plant influent BOD5 of 200 mg/liter.

    (A) Secondary and advanced secondary treatment. The detention times in Table Number 1 are based on the fractional BOD5 remaining in the wetland system's influent and the permitted effluent limits. For permitted effluent BOD5 concentration and removal efficiencies that fall between the listed quantities, linear interpolation is permissible. Table Number 1 is based on the following assumptions:

      (i) ambient winter conditions wastewater temperature of 7.5 degrees Centigrade (45.5 degrees Fahrenheit); and

      (ii) an average wastewater treatment plant influent BOD5 of 200 mg/liter. If the wastewater winter temperature is lower than that indicated above, detention times must be modified.

Attached Graphic

    (B) Advanced secondary treatment following pond systems only. The detention time is based on the assumption that the treatment facility is composed of a facultative lagoon followed by two stabilization ponds, each sized according to the current state design criteria found in this chapter. For applications where pond effluent is to be polished to meet an effluent BOD5 concentration of 30 mg/liter, a minimum of one-day detention time through the wetland system will be required.

  (3) Oxygen loadings. Since SFS should function in an aerobic environment, the wastewater dissolved oxygen level is critical. Surface area needed to maintain sufficient oxygen transfer through developed plant roots shall be designed based on approved and acceptable engineering methods.

(d) Free water surface system design.

  (1) Basic design parameters. FWS wetlands are sized according to primary and/or secondary treatment efficiency, i.e., fraction of remaining BOD5 , and the permitted 30-day average effluent discharge concentration of BOD5 . The following factors are considered in the selection of the design hydraulic and organic loadings: strength of the influent sewage, effectiveness of primary and/or secondary treatment, type of media, ambient wastewater temperature for winter conditions, and treatment efficiency required.

  (2) Organic loading. The following tables present typical ranges for detention time within the wetland system in days. Each detention time represents combinations of different classes of primary and secondary treatment and the different effluent parameters. Design engineers may submit sufficient operating data for similar installations, and/or actual field conditions to justify their efficiency calculations for the wetland system. The tables are based on the following assumptions: specific surface area of the media (stems, roots, detritus, etc. 15.7 m2/m3; ambient winter conditions wastewater temperature of 7.5 degrees Centigrade (45.5 degrees Fahrenheit); and an average wastewater treatment plant influent BOD5 of 200 mg/liter.

    (A) Secondary treatment. These detention times are based on the type and efficiency of the primary treatment unit which precedes the FWS wetlands.

      (i) Septic tank or facultative pond as primary treatment method.

Attached Graphic

Cont'd...

Next Page Previous Page

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page