<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 30ENVIRONMENTAL QUALITY
PART 1TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
CHAPTER 317DESIGN CRITERIA PRIOR TO 2008
RULE §317.4Wastewater Treatment Facilities

  (1) Pretreatment. Wastewater stabilization ponds shall be preceded by facilities for primary sedimentation of the raw sewage. Aerated lagoons or facultative lagoons may be utilized in place of conventional primary treatment facilities.

  (2) Imperviousness. All earthen structures proposed for use in domestic wastewater treatment or storage shall be constructed to protect groundwater resources. Where linings are necessary, the following methods are acceptable:

    (A) in-situ or placed clay soils having the following qualities may be utilized for pond lining:

      (i) more than 30% passing a 200-mesh sieve;

      (ii) liquid limit greater than 30%;

      (iii) plasticity index greater than 15; and

      (iv) a minimum thickness of two feet;

    (B) membrane lining with a minimum thickness of 20 mils, and an underdrain leak detection system;

    (C) other methods with commission approval.

  (3) Distribution of flow. Stabilization ponds shall be of such shape and size to insure even distribution of the wastewater flow throughout the entire pond. While the shapes of ponds may be dictated to some extent by the topography of the location, long narrow ponds are preferable and they should be oriented in the direction of the prevailing wind such that debris is blown toward the inlet. Ponds with narrow inlets or sloughs should be avoided.

  (4) Access area. Storm water drainage shall be excluded from all ponds. All vegetation shall be removed from within the pond area during construction. Access areas shall be cleared and maintained for a distance of at least 20 feet from the outside toes of the pond embankment walls.

  (5) Multiple ponds. The use of multiple ponds in pond systems is required. The operation of the ponds shall be flexible, enabling one or more ponds to be taken out of service without affecting the operation of the remaining ponds. The ponds shall be operated in series during routine operation periods.

  (6) Organic loading. The organic loading on the stabilization ponds, based on the total surface area of the ponds, shall not exceed 35 pounds of BOD5 per acre per day. The loading on the initial stabilization pond shall not exceed 75 pounds of BOD5 per acre per day.

  (7) Depth. The stabilization ponds or cells shall have a normal water depth of three to five feet.

  (8) Inlets and outlets. Multiple inlets and multiple outlets are required. The inlets and outlets shall be arranged to prevent short circuiting within the pond so that the flow of wastewater is distributed evenly throughout the pond. Multiple inlets and outlets shall be spaced evenly. All outlets shall be baffled with removable baffles to prevent floating material from being discharged, and shall be constructed so that the level of the pond surface may be varied under normal operating conditions. Submerged outlets shall be used to prevent the discharge of algae.

  (9) Embankment walls. The embankment walls should be compacted thoroughly and compaction details shall be covered in the specifications. Soil used in the embankment shall be free of foreign material such as paper, brush, and fallen trees. The embankment walls shall have a top width of at least 10 feet. Interior and exterior slope of the embankment wall should be one foot vertical to three feet horizontal. There shall be a freeboard of not less than two feet nor more than three feet based on the normal operating depth. All embankment walls shall be protected by planting grass or riprapping. Where embankment walls are subject to wave action, riprapping should be installed. Erosion stops and water seals shall be installed on all piping penetrating the embankments. Provisions should be made to change the operating level of the pond so the pond surface can be raised or lowered at least six inches.

  (10) Partially mixed aerated lagoons.

    (A) Horsepower. With partially mixed aerated lagoons, no attempt is made to keep all pond solids in suspension. Mechanical or diffused aeration equipment should be sized to provide a minimum of 1.6 pounds of oxygen per pound of BOD5 applied with the largest unit out of service. Where multiple ponds are used in series, the power input may be reduced as the influent BOD5 to each pond decreases. proposed oxygen transfer rates in excess of two pounds per horsepower-hour must be justified by actual performance data.

    (B) Pond sizing. Partially mixed aerated lagoons should be sized in accordance with the formula in subsection (i)(3) of this section using K-0.28. Pond length to width ratios should be three to one or four to one.

    (C) Imperviousness. Requirements for imperviousness, multiple cells, embankment walls, and inlets and outlets shall be the same as for other secondary treatment ponds.

(k) Facultative lagoon (raw wastewater stabilization pond).

  (1) Configuration. The length to width ratio of the lagoon should be three to one, with flow along the length from inlets near one end to outlets at the opposite end (other configurations may be approved if adequate means of prevention of short circuiting are provided). The length should be oriented in the direction of the prevailing winds with the inlet side located such that debris will be blown toward the inlet (generally, the north-northwest side). Inlet baffles shall be provided to collect flotable material. The outlets shall be constructed so that the water level of the lagoon may be varied under normal operating conditions. Storm water drainage shall be prevented from entering the lagoon. The design engineer may wish to locate the facultative lagoon in a central location with regard to the surrounding secondary ponds to facilitate compliance with the buffer zone requirement specified in Chapter 309 of this title (relating to Domestic Wastewater Effluent Limitations and Plant Siting).

  (2) Imperviousness. Requirements for imperviousness shall be the same as those for secondary treatment ponds.

  (3) Depth. The portion of the lagoon near the inlets shall have a 10 to 12 foot depth to provide sludge storage and anaerobic treatment. This deeper portion should be approximately 25% of the area of the lagoon bottom. The remainder of the pond should have a depth of five to eight feet.

  (4) Organic loading. The organic loading, based on the surface area of the facultative lagoon, shall not exceed 150 pounds of BOD5 per acre per day.

  (5) Odor control. The facultative lagoon shall have multiple inlets and the inlets should be submerged approximately 24 inches below the water surface to minimize odor but not disturb the anaerobic zone. Capabilities for recirculation at 50% to 100% of the design flow should be provided. Care should be taken to avoid situations where siphoning of lagoon contents through submerged inlets can occur.

  (6) Embankment walls. Refer to subsection (j)(9) of this section.

  (7) Subsequent treatment. The facultative lagoon effluent will normally be routed to a wastewater stabilization pond system for secondary treatment. In designing the stabilization pond system, it may be assumed that BOD removal in the facultative lagoon is 50%. The stabilization pond system shall contain two or more ponds.

(l) Filtration. Filtration must be employed as a unit operation to supplement suspended solids removal for those treatment facilities with tertiary effluent limitations (suspended solids effluent quality equal to or less than 10 mg/liter). Filtration may be employed as a unit operation for those treatment facilities with secondary or advanced secondary effluent limitations. The utilization of filtration in the design of the treatment facility normally provides effective removal of suspended biological floc and neutral density trash material which may remain in secondary clarifier effluent. Intermittent filter operation is acceptable where on line controls monitor plant performance or filters are not necessary to meet a specific discharge limitation.

  (1) General requirements.

    (A) Filter units shall be preceded by final clarifiers designed in accordance with subsection (d) of this section for secondary treatment criteria.

    (B) Filtered effluent, and not potable water, shall be utilized as the source of backwash water.

  (2) Deep bed, intermittently backwashed granular media filters.

    (A) Single media (sand filters), dual media (anthracite-sand filters), or mixed media filter types (nonstratified anthracite, sand, garnet, or other media) are acceptable for application; however, single media filters shall be designed for maximum filtration runs of six hours between backwash periods.

Cont'd...

Next Page Previous Page