TITLE 30ENVIRONMENTAL QUALITY
PART 1TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
CHAPTER 305CONSOLIDATED PERMITS
SUBCHAPTER DAMENDMENTS, RENEWALS, TRANSFERS, CORRECTIONS, REVOCATION, AND SUSPENSION OF PERMITS
RULE §305.70Municipal Solid Waste Permit and Registration Modifications

  (22) changes to an existing landfill gas collection system design. Changes made for the purpose of complying with other permits, rules, or regulations do not require prior approval under this section before implementation. Notification of changes made to a landfill gas collection system in order to comply with other permits, rules, or regulations shall be sent within 30 days to the executive director and the appropriate commission regional office. Upon receipt of the notification the executive director will determine if submittal of a modification is required;

  (23) submittal of a new Groundwater Sampling and Analysis Plan (GWSAP) or changes to an existing GWSAP;

  (24) submittal of a new waste acceptance plan or the addition of detailed narrative or design drawings which provide details for the acceptance of waste streams authorized within the permit or registration (e.g., Class 1 nonhazardous industrial waste);

  (25) revisions to an existing waste acceptance plan to include waste streams authorized by the permit or registration;

  (26) upgrade of an existing landfill groundwater monitoring system with no increase in depth or design, or the installation of monitor wells at a different depth or design in addition to wells in the approved groundwater monitoring system. Changes to the groundwater monitoring system resulting from a change in the groundwater characterization as defined in Chapter 330, Subchapter J of this title (relating to Groundwater Monitoring and Corrective Action), must be requested as an amendment under §305.62 of this title;

  (27) the plugging of monitoring wells (e.g., landfill gas or groundwater monitoring wells) when the executive director has determined that the plugging of monitoring wells is appropriate in various situations including, but not limited to, when a facility has completed the post-closure maintenance period, when an obsolete monitoring system is being replaced with a new monitoring system, or when a damaged monitoring well is being replaced;

  (28) changes to closure or post-closure care plans for technical corrections, updated testing procedures, etc.;

  (29) substitution of an equivalent financial assurance mechanism;

  (30) changes to a closure or post-closure care cost estimate required under §§330.503, 330.505, or 330.507 of this title (relating to Closure Cost Estimates for Landfills; Closure Cost Estimates For Storage and Processing Units; and Post-Closure Care Cost Estimates for Landfills) that result in an increase/decrease in the amount of financial assurance required if the increase/decrease in the cost estimate is due to an increase/decrease in the maximum area requiring closure;

  (31) changes in the amount of financial assurance required as the result of corrective action;

  (32) changes to the entry gate location that do not alter access traffic patterns delineated in the permit or registration;

(k) Paragraphs (1) - (13) of this subsection are modifications which require notice. For those modifications requiring notice, the permittee or registrant must send notice of the modification application by first-class mail in accordance with subsection (i) of this section and to all persons listed in §39.413 of this title:

  (1) the use of an alternate daily cover material on a permanent basis in accordance with §330.165(d) of this title (relating to Landfill Cover);

  (2) a modification in the operation of a landfill that will change the incoming waste stream to a more restrictive waste stream (i.e., a change from a Type I landfill operation to a Type IV landfill operation). The modification may be granted if the receipt of waste under the present operation ceases once the modification is approved; the filled portion of the landfill will be closed in accordance with Chapter 330, Subchapter K of this title (relating to Closure and Post-Closure); and the modification application details changes to the site development plan and site operating plan as appropriate to reflect the proposed change in operation;

  (3) installation of a landfill gas collection system for a landfill gas remediation plan in accordance with §330.371 of this title (relating to Landfill Gas Management);

  (4) changes to groundwater monitor well depth or design that are consistent with the groundwater characterization and approved monitoring system design, and that improve the effectiveness of the system in detecting contamination. Changes to the groundwater monitoring system resulting from a change in the groundwater characterization, must be requested as an amendment under §305.62 of this title;

  (5) changes to decrease sampling frequency (e.g., for groundwater and landfill gas monitoring systems);

  (6) changes to a site layout plan that relocate a liquid waste solidification facility or a petroleum-contaminated soil stabilization area;

  (7) changes to the facility legal description due to the addition of property for purposes of increasing the buffer zone as defined in §330.3 of this title;

  (8) changes to the excavation plan with no increase in the landfill's maximum permitted elevation, depth or permitted capacity and which do not alter the effectiveness of the groundwater monitoring system;

  (9) changes to the approved final contours and approved final slopes with no height or capacity increase over the maximum permitted height or capacity, with no impact to off-site drainage;

  (10) changes to include an alternative final cover design in accordance with §330.457(d) of this title (relating to Closure Requirements for Municipal Solid Waste Landfill Units that Receive Waste on or after October 9, 1993);

  (11) installation of a new leachate collection system not authorized in the existing permit;

  (12) changes to post-closure use of a landfill in accordance with §330.957 of this title (relating to Contents of the Development Permit and Workplan Application) during the post-closure care period;

  (13) name changes or transfers of municipal solid waste permits or registrations in accordance with §305.64 of this title (relating to Transfer of Permits) must be processed as permit or registration modification and require public notice after issuance. The mailing procedures of this subsection shall be followed. Mailing procedures shall be completed after the transfer is approved and within 20 days following the approval.

(l) In case of an application for a permit or registration modification for a change not listed in subsection (j) or (k) of this section, the executive director shall make a determination as to whether the change is eligible to be processed as a permit or registration modification and if the change requires public notice in accordance with subsection (i) of this section. In making this determination, the executive director shall consider if the requested change meets the criteria in subsections (d) and (e) of this section. Public notice shall be reserved for modification applications of similar impact as modifications listed in subsection (k) of this section.

(m) The applicant, public interest counsel, or other person may file with the chief clerk a motion to overturn the executive director's action on a modification application in accordance with §50.139 of this title (relating to Motion to Overturn Executive Director's Decision).


Source Note: The provisions of this §305.70 adopted to be effective December 30, 2001, 26 TexReg 10993; amended to be effective May 29, 2008, 33 TexReg 4157; amended to be effective May 14, 2020, 45 TexReg 3109