<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 30ENVIRONMENTAL QUALITY
PART 1TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
CHAPTER 330MUNICIPAL SOLID WASTE
SUBCHAPTER AGENERAL INFORMATION
RULE §330.3Definitions

  (123) Pyrolysis--A manufacturing process through which post-use polymers are heated in an oxygen-deficient atmosphere until melted and thermally decomposed and then cooled, condensed, and converted into a valuable raw, intermediate, or final product, including a plastic, monomer, chemical, wax, lubricant, or chemical feedstock or crude oil, diesel, gasoline, diesel and gasoline blendstock, home heating oil, ethanol, or another fuel. The term does not include incineration.

  (124) Pyrolysis facility--A manufacturing facility that receives, separates, stores, and converts post-use polymers using pyrolysis. The commission may not consider a pyrolysis facility to be a hazardous waste management facility, a solid waste management facility, or an incinerator.

  (125) Qualified groundwater scientist--A licensed geoscientist or licensed engineer who has received a baccalaureate or post-graduate degree in the natural sciences or engineering and has sufficient training in groundwater hydrology and related fields as may be demonstrated by state registration, professional certifications, or completion of accredited university programs that enable the individual to make sound professional judgments regarding groundwater monitoring, contaminant fate and transport, and corrective action.

  (126) Radioactive waste--Waste that requires specific licensing under 25 TAC Chapter 289 (relating to Radiation Control), and the rules adopted by the commission under the Texas Health and Safety Code.

  (127) Recoverable feedstock--One or more of the following materials, derived from recoverable waste other than coal refuse, that has been processed so that it may be used as feedstock in a gasification facility:

    (A) post-use polymers; and

    (B) material, including municipal solid waste containing post-use polymers and other post-industrial waste containing post-use polymers, that has been processed into a fuel or feedstock for which the commission or the United States Environmental Protection Agency has made a non-waste determination under 40 Code of Federal Regulations §241.3(c).

  (128) Recyclable material--A material that has been recovered or diverted from the nonhazardous waste stream for purposes of reuse, recycling, or reclamation, a substantial portion of which is consistently used in the manufacture of products that may otherwise be produced using raw or virgin materials. The term includes post-use polymers and recoverable feedstocks that are converted through pyrolysis or gasification into valuable raw, intermediate, and final products. Recyclable material is not solid waste. However, recyclable material may become solid waste at such time, if any, as it is abandoned or disposed of rather than recycled, whereupon it will be solid waste with respect only to the party actually abandoning or disposing of the material.

  (129) Recycling--A process by which materials that have served their intended use or are scrapped, discarded, used, surplus, or obsolete are collected, separated, or processed and returned to use in the form of raw materials in the production of new products. Except for mixed municipal solid waste composting, that is, composting of the typical mixed solid waste stream generated by residential, commercial, and/or institutional sources, recycling includes the composting process if the compost material is put to beneficial use.

  (130) Refuse--Same as rubbish.

  (131) Registration--The act of filing information with the commission for review and approval for specific solid waste management activities that do not require a permit, as determined by this chapter.

  (132) Regulated asbestos-containing material--Regulated asbestos-containing material as defined in 40 Code of Federal Regulations Part 61, as amended, includes: friable asbestos material, Category I nonfriable asbestos-containing material that has become friable; Category I nonfriable asbestos-containing material that will be or has been subjected to sanding, grinding, cutting, or abrading; or Category II nonfriable asbestos-containing material that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations.

  (133) Regulated hazardous waste--A solid waste that is a hazardous waste as defined in 40 Code of Federal Regulations (CFR) §261.3 and that is not excluded from regulation as a hazardous waste under 40 CFR §261.4(b), or that was not generated by a conditionally exempt small-quantity generator.

  (134) Resource recovery--The recovery of material or energy from solid waste.

  (135) Resource recovery facility--A solid waste processing facility at which solid waste is processed for the purpose of extracting, converting to energy, or otherwise separating and preparing solid waste for reuse.

  (136) Rubbish--Nonputrescible solid waste (excluding ashes), consisting of both combustible and noncombustible waste materials. Combustible rubbish includes paper, rags, cartons, wood, excelsior, furniture, rubber, plastics, brush, or similar materials; noncombustible rubbish includes glass, crockery, tin cans, aluminum cans, and similar materials that will not burn at ordinary incinerator temperatures (1,600 degrees Fahrenheit to 1,800 degrees Fahrenheit).

  (137) Run-off--Any rainwater, leachate, or other liquid that drains over land from any part of a facility.

  (138) Run-on--Any rainwater, leachate, or other liquid that drains over land onto any part of a facility.

  (139) Salvaging--The controlled removal of waste materials for utilization, recycling, or sale.

  (140) Saturated zone--That part of the earth's crust in which all voids are filled with water.

  (141) Scavenging--The uncontrolled and unauthorized removal of materials at any point in the solid waste management system.

  (142) Scrap tire--Any tire that can no longer be used for its original intended purpose.

  (143) Seasonal high-water level--The highest measured or calculated water level in an aquifer during investigations for a permit application and/or any groundwater characterization studies at a facility.

  (144) Septage--The liquid and solid material pumped from a septic tank, cesspool, or similar sewage treatment system.

  (145) Site--Same as facility.

  (146) Site development plan--A document, prepared by the design engineer, that provides a detailed design with supporting calculations and data for the development and operation of a solid waste site.

  (147) Site operating plan--A document, prepared by the design engineer in collaboration with the facility operator, that provides general instruction to facility management and operating personnel throughout the operating life of the facility in a manner consistent with the engineer's design and the commission's regulations to protect human health and the environment and prevent nuisances.

  (148) Site operator--The holder of, or the applicant for, an authorization (or license) for a municipal solid waste facility.

  (149) Sludge--Any solid, semi-solid, or liquid waste generated from a municipal, commercial, or industrial wastewater treatment plant, water-supply treatment plant, or air pollution control facility, exclusive of the treated effluent from a wastewater treatment plant.

  (150) Small municipal solid waste landfill--A municipal solid waste landfill unit (Type IAE) at which less than 20 tons of authorized types of waste are disposed of daily based on an annual average and/or a Type IVAE landfill unit at which less than 20 tons of authorized types of waste are disposed of daily based on an annual average. A Type IAE landfill permit may include additional authorization for a separate Type IVAE landfill unit. If a permit contains dual authorization for Type IAE and Type IVAE landfill units, the permit must designate separate areas for the units and where all disposal cells will be located within each unit.

  (151) Solid waste--Garbage, rubbish, refuse, sludge from a wastewater treatment plant, water supply treatment plant, or air pollution control facility, and other discarded material, including solid, liquid, semi-solid, or contained gaseous material resulting from industrial, municipal, commercial, mining, and agricultural operations and from community and institutional activities. The term does not include:

    (A) solid or dissolved material in domestic sewage, or solid or dissolved material in irrigation return flows, or industrial discharges subject to regulation by permit issued under Texas Water Code, Chapter 26;

    (B) soil, dirt, rock, sand, and other natural or man-made inert solid materials used to fill land if the object of the fill is to make the land suitable for the construction of surface improvements;

Cont'd...

Next Page Previous Page

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page