RULE §116.12Nonattainment and Prevention of Significant Deterioration Review Definitions

      (vi) an increase in the hours of operation or in the production rate (unless the change is prohibited under any federally enforceable permit condition that was established after December 21, 1976);

      (vii) any change in ownership at a stationary source;

      (viii) any change in emissions of a pollutant at a site that occurs under an existing plant-wide applicability limit;

      (ix) the installation, operation, cessation, or removal of a temporary clean coal technology demonstration project, provided that the project complies with the state implementation plan and other requirements necessary to attain and maintain the national ambient air quality standard during the project and after it is terminated;

      (x) for prevention of significant deterioration review only, the installation or operation of a permanent clean coal technology demonstration project that constitutes re-powering, provided that the project does not result in an increase in the potential to emit of any regulated pollutant emitted by the unit. This exemption shall apply on a pollutant-by-pollutant basis; or

      (xi) for prevention of significant deterioration review only, the reactivation of a clean coal-fired electric utility steam generating unit.

  (21) Necessary preconstruction approvals or permits--Those permits or approvals required under federal air quality control laws and regulations and those air quality control laws and regulations that are part of the applicable state implementation plan.

  (22) Net emissions increase--The amount by which the sum of the following exceeds zero: the project emissions increase plus any sourcewide creditable contemporaneous emission increases, minus any sourcewide creditable contemporaneous emission decreases. Baseline actual emissions shall be used to determine emissions increases and decreases.

    (A) An increase or decrease in emissions is creditable only if the following conditions are met:

      (i) it occurs during the contemporaneous period;

      (ii) the executive director has not relied on it in issuing a federal new source review permit for the source and that permit is in effect when the increase in emissions from the particular change occurs; and

      (iii) in the case of prevention of significant deterioration review only, an increase or decrease in emissions of sulfur dioxide, particulate matter, or nitrogen oxides that occurs before the applicable minor source baseline date is creditable only if it is required to be considered in calculating the amount of maximum allowable increases remaining available.

    (B) An increase in emissions is creditable if it is the result of a physical change in, or change in the method of operation of a stationary source only to the extent that the new level of emissions exceeds the baseline actual emission rate. Emission increases at facilities under a plant-wide applicability limit are not creditable.

    (C) A decrease in emissions is creditable only to the extent that all of the following conditions are met:

      (i) the baseline actual emission rate exceeds the new level of emissions;

      (ii) it is federally enforceable at and after the time that actual construction on the particular change begins;

      (iii) the executive director has not relied on it in issuing a prevention of significant deterioration or a nonattainment permit;

      (iv) the decrease has approximately the same qualitative significance for public health and welfare as that attributed to the increase from the particular change; and

      (v) in the case of nonattainment applicability analysis only, the state has not relied on the decrease to demonstrate attainment or reasonable further progress.

    (D) An increase that results from a physical change at a source occurs when the emissions unit on which construction occurred becomes operational and begins to emit a particular pollutant. Any replacement unit that requires shakedown becomes operational only after a reasonable shakedown period, not to exceed 180 days.

  (23) Offset ratio--For the purpose of satisfying the emissions offset reduction requirements of 42 United States Code, §7503(a)(1)(A), the emissions offset ratio is the ratio of total actual reductions of emissions to total emissions increases of such pollutants. The minimum offset ratios are included in Table I of this section under the definition of major modification. In order for a reduction to qualify as an offset, it must be certified as an emission credit under Chapter 101, Subchapter H, Division 1 or 4 of this title (relating to Emission Credit Banking and Trading; or Discrete Emission Credit Banking and Trading), except as provided for in §116.170(b) of this title (relating to Applicability of Emission Reductions as Offsets). The reduction must not have been relied on in the issuance of a previous nonattainment or prevention of significant deterioration permit.

  (24) Plant-wide applicability limit--An emission limitation expressed, in tons per year, for a pollutant at a major stationary source, that is enforceable and established in a plant-wide applicability limit permit under §116.186 of this title (relating to General and Special Conditions).

  (25) Plant-wide applicability limit effective date--The date of issuance of the plant-wide applicability limit permit.

  (26) Plant-wide applicability limit major modification--Any physical change in, or change in the method of operation of the plant-wide applicability limit source that causes it to emit the plant-wide applicability limit pollutant at a level equal to or greater than the plant-wide applicability limit.

  (27) Plant-wide applicability limit permit--The new source review permit that establishes the plant-wide applicability limit.

  (28) Plant-wide applicability limit pollutant--The pollutant for which a plant-wide applicability limit is established at a major stationary source.

  (29) Potential to emit--The maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or enforceable operational limitation on the capacity of the stationary source to emit a pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, may be treated as part of its design only if the limitation or the effect it would have on emissions is federally enforceable. Secondary emissions, as defined in 40 Code of Federal Regulations §51.165(a)(1)(viii), do not count in determining the potential to emit for a stationary source.

  (30) Project net--The sum of the following: the project emissions increase, minus any sourcewide creditable emission decreases proposed at the source between the date of application for the modification and the date the resultant modification begins emitting. Baseline actual emissions shall be used to determine emissions increases and decreases. Increases and decreases must meet the creditability criteria listed under the definition of net emissions increase in this section.

  (31) Projected actual emissions--The maximum annual rate, in tons per year, at which an existing facility is projected to emit a federally regulated new source review pollutant in any rolling 12-month period during the five years following the date the facility resumes regular operation after the project, or in any one of the ten years following that date, if the project involves increasing the facility's design capacity or its potential to emit that federally regulated new source review pollutant. In determining the projected actual emissions, the owner or operator of the major stationary source shall include unauthorized emissions from planned maintenance, startup, or shutdown activities, which were historically unauthorized and subject to reporting under Chapter 101 of this title (relating to General Air Quality Rules), to the extent they have been authorized, or are being authorized; and fugitive emissions to the extent quantifiable; and shall consider all relevant information, including, but not limited to, historical operational data, the company's own representations, the company's expected business activity and the company's highest projections of business activity, the company's filings with the state or federal regulatory authorities, and compliance plans under the approved state implementation plan.

  (32) Project emissions increase--Project emissions increases are determined using the following methods:

    (A) for existing facilities that are part of the project, the sum of the differences between the projected actual emissions and the baseline actual emissions. In calculating any increase in emissions that results from the project, that portion of the facility's emissions following the project that the facility could have accommodated during the consecutive 24-month period used to establish the baseline actual emissions and that are also unrelated to the particular project, including any increased utilization due to product demand growth may be excluded from the project emission increase. The potential to emit from the Cont'd...