RULE §336.1105Definitions

    (B) for the purposes of §336.1129(p) - (aa) of this title (relating to Technical Requirements), "reclamation plan" is the plan detailing activities to accomplish reclamation of the by-product material disposal area in accordance with the technical criteria of this section. The reclamation plan shall include a schedule for reclamation milestones that are key to the completion of the final radon barrier, including as appropriate, but not limited to, windblown tailings retrieval and placement on the pile, interim stabilization (including dewatering or the removal of freestanding liquids and recontouring), and final radon barrier construction. Reclamation of by-product material shall also be addressed in the closure plan. The detailed reclamation plan may be incorporated into the closure plan.

  (33) Restoration--Those activities that seek to return the groundwater at an underground injection control permitted site to restoration levels established by permit.

  (34) Security--This term has the same meaning as financial assurance.

  (35) Surface impoundment--A natural topographic depression, man-made excavation, or diked area at a conventional uranium mill, which is designed to receive waste from the milling process which may contain liquid wastes or wastes containing free liquids, solid wastes, mill site demolition materials and debris, and other by-product materials from the milling site.

  (36) Unrefined and unprocessed ore--Ore in its natural form before any processing, such as grinding, roasting, beneficiating, or refining. Processing does not include sieving or encapsulation of ore or preparation of samples for laboratory analysis.

  (37) Uppermost aquifer--The geologic formation nearest the natural ground surface that is an aquifer, as well as lower aquifers that are hydraulically interconnected with this aquifer within the facility's property boundary.

  (38) Uranium recovery--Any uranium extraction or concentration activity that results in the production of "by-product material" as it is defined in this chapter and as it pertains to uranium ore only. As used in this definition, "Uranium recovery" has the same meaning as "uranium milling" in 10 Code of Federal Regulations §40.4.


Source Note: The provisions of this §336.1105 adopted to be effective February 28, 2008, 33 TexReg 1570; amended to be effective March 12, 2009, 34 TexReg 1688; amended to be effective December 8, 2016, 41 TexReg 9583