RULE §15.4Dune Protection Standards

  (3) Mitigation. Mitigation means repairing, rehabilitating, or restoring affected dunes and dune vegetation. Local governments shall require permittees, as a condition of the permit, to mitigate all adverse effects to dunes and dune vegetation which will occur after a permittee has avoided and minimized such adverse effects to the greatest extent practicable. Local governments shall require the permittee to mitigate damage to dunes and dune vegetation so as to provide, when compared to the pre-existing dunes and dune vegetation, an equal or greater area of vegetative cover and dune volume, an equal or greater degree of protection against damage to natural resources, and an equal or greater degree of protection against flood and erosion damage and other nuisance conditions to adjacent properties. When determining the appropriate mitigation method, local governments shall consider the recommendations of the General Land Office, federal and state natural resource agencies, and dune vegetation experts.

    (A) Mitigation standards for dunes. Local governments may allow a permittee to mitigate adverse effects on dunes using vegetative or mechanical means. Local governments shall require that a permittee proposing to restore dunes and dune vegetation as provided in §15.7(e) of this title (relating to Local Government Management of the Public Beach) use the following techniques:

      (i) restore dunes to approximate the naturally formed dune position or location, contour, volume, elevation, vegetative cover, and sediment content in the area;

      (ii) allow for the natural dynamics and migration of dunes;

      (iii) use discontinuous temporary sand fences or an approved method of dune restoration, where appropriate, considering the characteristics of the site; and

      (iv) restore or repair dunes using indigenous vegetation that will achieve the same protective capability or greater capability as the surrounding natural dunes.

    (B) Stabilization of critical dune areas. Local governments shall give priority for stabilization to blowouts and breaches when permitting restoration of dunes. Before permitting stabilization of washover areas, local governments shall:

      (i) assess the overall impact of the project on the beach/dune system;

      (ii) consider any adverse effects on hydrology and drainage which will result from the project; and

      (iii) require that equal or better public beach access be provided to compensate for impairment of any public beach access previously provided by the washover area.

  (4) Compensation. Compensation means compensating for effects on dunes and dune vegetation by replacing or providing substitute dunes and dune vegetation. Local governments shall require the permit holder to compensate for the adverse effects to dunes and dune vegetation at a 1:1 ratio. Compensation may be undertaken both on-site and off-site; however, off-site compensation may only be allowed as provided in subparagraph (B) of this paragraph.

    (A) On-site compensation. On-site compensation consists of replacement of the affected dunes or dune vegetation on the property where the damage to dunes and dune vegetation occurred and seaward of the local dune protection line. A local government shall require permittees to undertake compensation on the construction site, where practicable. A local government shall require a permittee to follow the requirements provided in paragraph (3)(A) of this subsection and paragraph (4)(C)(iii) - (iv) of this subsection when replacing dunes or dune vegetation.

    (B) Off-site compensation. Off-site compensation consists of replacement of the affected dunes or dune vegetation in a location outside the boundary of the property where the damage to dunes and dune vegetation occurred. The landward limit of allowable off-site mitigation is the local dune protection line. Local governments shall require that a permittee's compensation efforts take place on the construction site unless the permittee demonstrates the following facts to the local government:

      (i) on-site compensation is not practicable;

      (ii) the off-site compensation will be located as close to the construction site as practicable;

      (iii) the proffered off-site compensation has achieved a 1:1 ratio of proposed adverse effects on successful, completed, and stabilized restoration prior to beginning construction;

      (iv) the permittee has notified FEMA, Region 6, Risk Analysis Branch, of the proposed off-site compensation.

    (C) Information required for off-site compensation. Local governments shall require permittees to provide the following information when proposing off-site compensation:

      (i) the name, address, phone number, and electronic mail address, if applicable, of the owner of the property where the off-site compensation will be located;

      (ii) a legal description of property intended to be used for the proposed off-site compensation;

      (iii) the source of sand and the dune vegetation;

      (iv) all information regarding permits and certificates issued for the restoration of dunes on the compensation site;

      (v) all relevant information regarding the success, current status, and stabilization of the dune restoration efforts on the compensation site;

      (vi) any increase in potential flood damage to the site where the adverse effects on dunes and dune vegetation will occur and to the public and private property adjacent to that site; and

      (vii) the proposed date of initiation of the compensation. Local governments shall include a condition in each permit authorizing off-site compensation which requires permittees to notify local governments in writing of the actual date of initiation within 10 working days after compensation is initiated. If the permittee fails to begin compensation on the date proposed in the application, the permittee shall provide the local government with the reason for the delay. Local governments shall take this reason into account when determining whether a permittee has violated the compensation deadline.

  (5) Compensation for adverse effects on dune vegetation. Local governments shall require that permittees compensate for adverse effects on dune vegetation by planting indigenous vegetation on the affected dunes and shall consider the recommendations of the General Land Office, federal and state natural resource agencies, and dune vegetation experts. Local governments may allow a permittees to use temporary sand fencing or another approved method of dune restoration. Local governments shall prohibit a permittee from compensating for adverse effects on dune vegetation by removing existing vegetation from private or state-owned property unless the permittee has received prior written permission from the property owner or the state. In addition to the requirement that permission be obtained from the property owner, all persons are prohibited from removing vegetation from a critical dune area or seaward of a dune protection line unless specifically authorized to do so in a dune protection permit. Local governments shall include conditions in such permits requiring the permittee to provide a copy of the written permission for vegetation removal and to identify the source of any sand and vegetation which will be used to compensate for adverse effects on dunes and dune vegetation in the mitigation plan contained in the permit application.

(g) Mitigation or compensation deadline.

  (1) Initiation of mitigation or compensation. Local governments shall require permittees to begin mitigation or compensation for any adverse effect(s) to dunes and dune vegetation prior to or concurrent with the commencement of construction. If mitigation or compensation is not completed in accordance with the mitigation or compensation plan prior to commencement of construction of any structure, the local government shall require that the permittee provide the local government with proof of financial responsibility in an amount equal to that necessary to complete the mitigation or compensation. This can be done in the form of an irrevocable letter of credit, performance bond, or any other instrument acceptable to the local government.

  (2) Completion of mitigation or compensation. Local governments shall require permittees to conduct compensation efforts continuously until the repaired, rehabilitated, and restored dunes and dune vegetation are equal or superior to the pre-existing dunes and dune vegetation. These efforts shall include preservation and maintenance pending completion of mitigation or compensation.

  (3) Local government determination of completion of mitigation or compensation. Local governments shall determine a mitigation or compensation project is complete when the dune restoration project's position, contour, volume, elevation, and vegetative cover matches or exceeds the surrounding naturally formed dunes.

Cont'd...