At a minimum, the following information pertaining to the proposed
subdivision shall be provided as specified in §230.3(c) of this title
(relating to Certification of Groundwater Availability for Platting):
(1) the purpose of the proposed subdivision, for example, single
family residential, multi-family residential, non-residential, commercial,
or industrial;
(2) the size of the proposed subdivision in acres;
(3) the number of proposed lots within the proposed subdivision;
(4) the average size (in acres) of the proposed lots in
the proposed subdivision;
(5) the anticipated method of water distribution to the
proposed lots in the proposed subdivision including, but not limited to:
(A) an expansion of an existing public water supply system
to serve the proposed subdivision (if groundwater under the subdivision is
to be the source of water supply);
(B) a new public water supply system for the proposed subdivision;
(C) individual water wells to serve individual lots; or
(D) a combination of methods;
(6) if the anticipated method of water distribution
for the proposed subdivision is from an expansion of an existing public water
supply system or from a proposed public water supply system, evidence required
under §290.39(c)(1) of this title (relating to Rules and Regulations
for Public Water Systems) which shall be provided demonstrating that written
application for service was made to the existing water providers within a
1/2-mile radius of the subdivision; and
(7) any additional information required by the municipal
or county authority as part of the plat application.
|