<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 30ENVIRONMENTAL QUALITY
PART 1TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
CHAPTER 305CONSOLIDATED PERMITS
SUBCHAPTER FPERMIT CHARACTERISTICS AND CONDITIONS
RULE §305.126Additional Standard Permit Conditions for Waste Discharge Permits

(a) Whenever flow measurements for any sewage treatment plant facility in the state reaches 75% of the permitted average daily or annual average flow for three consecutive months, the permittee must initiate engineering and financial planning for expansion and/or upgrading of the wastewater treatment and/or collection facilities. Whenever the average daily or annual average flow reaches 90% of the permitted average daily flow for three consecutive months, the permittee shall obtain necessary authorization from the commission to commence construction of the necessary additional treatment and/or collection facilities. In the case of a wastewater treatment facility which reaches 75% of the permitted average flow for three consecutive months, and the planned population to be served or the quantity of waste produced is not expected to exceed the design limitations of the treatment facility, the permittee will submit an engineering report supporting this claim to the executive director. If in the judgment of the executive director the population to be served will not cause permit noncompliance, then the requirements of this section may be waived. To be effective, any waiver must be in writing and signed by the director of the enforcement division of the commission, and such waiver of these requirements will be reviewed upon expiration of the existing permit; however, any such waiver shall not be interpreted as condoning or excusing any violation of any permit parameter.

(b) The permittee shall give notice to the executive director as soon as possible of any planned physical alterations or additions to the permitted facility. In addition to the requirements of §305.125(7) of this title (relating to Standard Permit Conditions), notice shall also be required under this subsection when:

  (1) the alteration or addition to a permitted facility may meet one of the criteria for determining whether a facility is a new source in §305.534 of this title (relating to New Sources and New Dischargers); or

  (2) the alteration or addition could significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants which are subject neither to effluent limitations in the permit, nor to notification requirements under 40 Code of Federal Regulations (CFR) §122.42(a)(1) as adopted by §305.531 of this title (relating to Establishing and Calculating Additional Conditions and Limitations for TPDES Permits);

  (3) the alteration or addition results in a significant change in the permittee's sludge use or disposal practices, and such alteration, addition, or change may justify the application of permit conditions that are different from or absent in the existing permit, including notification of additional use or disposal sites not reported during the permit application process or not reported pursuant to an approved land application plan.

(c) If the permittee is a new discharger, it must provide quantitative data described in 40 CFR §122.21(h)(4)(I) and (ii) no later than two years after commencement of discharge; however, the permittee need not conduct tests which the permittee has already performed and reported under the discharge monitoring requirements of its TPDES permit.


Source Note: The provisions of this §305.126 adopted to be effective June 19, 1986, 11 TexReg 2597; amended to be effective June 25, 1990, 15 TexReg 3416; amended to be effective October 8, 1990, 15 TexReg 5492; amended to be effective April 24, 1995, 20 TexReg 2708; amended to be effective December 27, 1998, 23 TexReg 12930.

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page