<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 31NATURAL RESOURCES AND CONSERVATION
PART 10TEXAS WATER DEVELOPMENT BOARD
CHAPTER 356GROUNDWATER MANAGEMENT
SUBCHAPTER GBRACKISH GROUNDWATER PRODUCTION ZONES
RULE §356.72Annual Report Review

(a) If a district makes a request under Texas Water Code §36.1015(j), the agency will investigate and issue a technical report to the district that sent the request, subject to subsection (b) of this subsection.

(b) Upon receipt of a request, the agency will determine whether it has received the applicable annual report and all of the information required under Texas Water Code §36.1015(e)(6), and for a project located in a designated brackish groundwater production zone in the Gulf Coast Aquifer, the information required to be collected under Texas Water Code §36.1015(e)(5) related to subsidence. If the agency has not received all of the information required under Texas Water Code §36.1015(e)(6) or §36.1016(e)(5), as applicable, the agency will notify the district of the missing information and will not conduct a technical review of the reports until all required information is received.

(c) Not later than the 120th day after the date the agency receives all of the required information, the agency will investigate and issue a technical report on whether:

  (1) brackish groundwater production under the project that is the subject of the report from the designated brackish groundwater production zone is projected to cause:

    (A) significant aquifer level declines in the same or an adjacent aquifer, subdivision of an aquifer, or geologic stratum that were not anticipated by the agency in the designation of the zone;

    (B) negative effects on quality of water in an aquifer, subdivision of an aquifer, or geologic stratum; or

    (C) for a project located in a designated brackish groundwater production zone in the Gulf Coast Aquifer, subsidence during the permit term; or

  (2) whether not enough information is available to determine whether brackish groundwater production under the project that is the subject of the report from the designated brackish groundwater production zone is projected to cause the conditions listed in subsection (c)(1) of this section.


Source Note: The provisions of this §356.72 adopted to be effective February 11, 2021, 46 TexReg 931

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page