<<Prev Rule | Texas Administrative Code |
Next Rule>> |
TITLE 16 | ECONOMIC REGULATION |
PART 1 | RAILROAD COMMISSION OF TEXAS |
CHAPTER 3 | OIL AND GAS DIVISION |
RULE §3.18 | Mud Circulation Required |
When coming out of the hole with the drill pipe, drilling fluid shall be circulated until equalized, and a fill-up line shall be turned into the casing to insure a full load of fluid on the bottom of the hole at all times. |
Source Note: The provisions of this §3.18 adopted to be effective January 1, 1976. |