<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 30ENVIRONMENTAL QUALITY
PART 1TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
CHAPTER 116CONTROL OF AIR POLLUTION BY PERMITS FOR NEW CONSTRUCTION OR MODIFICATION
SUBCHAPTER GFLEXIBLE PERMITS
RULE §116.711Flexible Permit Application

In order to be granted a flexible permit or flexible permit amendment, the owner or operator of the proposed facility shall submit a permit application which must include:

  (1) a completed Form PI-1 General Application signed by an authorized representative of the applicant. All additional support information specified on the form must be provided before the application is complete;

  (2) information which demonstrates that emissions from the facility, including any associated dockside vessel emissions, meet all of the following:

    (A) Protection of public health and welfare.

      (i) The emissions from the proposed facility, group of facilities, or account as determined under §116.716 of this title (relating to Emission Caps and Individual Emission Limitations), will comply with all applicable rules of the commission and with the intent of the Texas Clean Air Act, including protection of the health and physical property of the people.

      (ii) In considering the issuance of a flexible permit for construction or modification of any facility, group of facilities, or account within 3,000 feet or less of an elementary, junior high/middle, or senior high school, the commission shall consider any possible adverse short-term or long-term side effects that an air contaminant or nuisance odor from the facility, group of facilities, or account may have on the individuals attending these school facilities.

    (B) Measurement of emissions. The proposed facility, group of facilities, or account will have provisions for measuring the emission of air contaminants as determined by the executive director. This may include the installation of sampling ports on exhaust stacks and construction of sampling platforms in accordance with guidelines in the "Texas Commission on Environmental Quality Sampling Procedures Manual."

    (C) Best available control technology (BACT).

      (i) All facilities authorized by the flexible permit shall utilize BACT consistent with the following:

        (I) All new facilities must utilize BACT.

        (II) Existing facilities must utilize BACT with consideration given to the technical practicability and economic reasonableness of reducing or eliminating the emissions. Control technology that is more stringent than BACT may be used on certain facilities to provide the emission reductions necessary to comply with this requirement on a group of existing facilities, provided however, that the existing level of control may not be lessened for any facility from its current authorization.

      (ii) For pollutants from new or modified facilities that constitute a new major stationary source or major modification as defined by §116.12 of this title (relating to Nonattainment and Prevention of Significant Deterioration Review Definitions), control technology shall be demonstrated as required by §§116.150, 116.151, or 116.160 of this title (relating to New Major Source or Major Modification in Ozone Nonattainment Areas; New Major Source or Major Modification in Nonattainment Area Other Than Ozone; and Prevention of Significant Deterioration Requirements, respectively), as applicable, for each new or modified facility.

      (iii) For new facilities and proposed affected sources (as defined in §116.15(1) of this title (relating to Section 112(g) Definitions)) subject to Subchapter E of this chapter (relating to Hazardous Air Pollutants: Regulations Governing Constructed or Reconstructed Major Sources (FCAA, §112(g), 40 CFR Part 63)), the use of BACT shall be demonstrated for the individual facility or affected source.

    (D) New Source Performance Standards (NSPS). The emissions from each affected facility as defined in 40 Code of Federal Regulations (CFR), Part 60 will meet at least the requirements of any applicable NSPS as listed under Title 40 CFR Part 60, promulgated by the United States Environmental Protection Agency under authority granted under the Federal Clean Air Act, §111, as amended.

    (E) National Emission Standards for Hazardous Air Pollutants (NESHAPS). The emissions from each facility subject to 40 CFR Part 61 will meet at least the requirements of any applicable NESHAPS, as listed under 40 CFR Part 61, promulgated by EPA under authority granted under the FCAA, §112, as amended.

    (F) NESHAPS for source categories. The emissions from each affected facility shall meet at least the requirements of any applicable maximum achievable control technology (MACT) standard as listed under 40 CFR Part 63, promulgated by the EPA under FCAA, §112 or as listed under Chapter 113, Subchapter C of this title (relating to National Emissions Standards for Hazardous Air Pollutants for Source Categories (FCAA, §112, 40 CFR Part 63)).

    (G) Performance demonstration. The proposed facility, group of facilities, or account will achieve the performance specified in the flexible permit application. The applicant may be required to submit additional engineering data after a flexible permit has been issued in order to demonstrate further that the proposed facility, group of facilities, or account will achieve the performance specified in the flexible permit. In addition, initial compliance testing with ongoing compliance determined through engineering calculations based on measured process variables, parametric or predictive monitoring, stack monitoring, or stack testing shall be required as specified in each flexible permit.

    (H) Nonattainment review. If the proposed facility, group of facilities, or account is located in a nonattainment area, each facility shall comply with all applicable requirements concerning nonattainment review in this chapter.

    (I) Prevention of Significant Deterioration (PSD) review. If the proposed facility, group of facilities, or account is located in an attainment area, each facility shall comply with all applicable requirements in this chapter concerning PSD review.

    (J) Air dispersion modeling or ambient monitoring. Computerized air dispersion modeling or ambient monitoring may be required by the commission's Air Permits Division to determine the air quality impacts from the facility, group of facilities, or account. In conducting a review of a permit application for a shipbuilding or ship repair operation, the commission will not require and may not consider air dispersion modeling results predicting ambient concentrations of non-criteria air contaminants over coastal waters of the state. The commission shall determine compliance with non-criteria ambient air contaminant standards and guidelines at land-based off-property locations.

    (K) Federal standards of review for constructed or reconstructed major sources of hazardous air pollutants. If the proposed source is an affected source (as defined in §116.15(1) of this title), it shall comply with all applicable requirements under Subchapter E of this chapter.

    (L) Mass cap and trade allocations. If subject to Chapter 101, Subchapter H, Division 3 of this title (relating to Mass Emissions Cap and Trade Program) the proposed facility, group of facilities, or account must obtain allocations to operate.

    (M) Application content. In addition to other requirements of this chapter, the applicant shall:

      (i) identify each air contaminant for which an emission cap is desired;

      (ii) identify each facility to be included in the flexible permit;

      (iii) identify each source of emissions to be included in the flexible permit and for each source of emissions identify the Emission Point Number (EPN) and the air contaminants emitted;

      (iv) for each emission cap, identify all associated EPNs and facilities (including description, common name, and facility identification number) and provide emission rate calculations based on the expected maximum capacity and the proposed control technology;

      (v) for each individual emission limitation, identify the EPN and provide emission rate calculations based on the expected maximum capacity and the proposed control technology; and

      (vi) if the flexible permit application includes facilities currently authorized by a permit issued under Subchapter B of this chapter (relating to New Source Review Permits), the applicant shall identify any terms, conditions, and representations in the Subchapter B permit or permits which will be superseded by or incorporated into the flexible permit. The applicant shall include an analysis of how the conditions and control requirements of Subchapter B permits will be carried forward in the proposed flexible permit.

    (N) Proposed control technology and compliance demonstration. The applicant shall specify the control technology proposed for each facility and demonstrate compliance with all emission caps at expected maximum production capacity.


Source Note: The provisions of this §116.711 adopted to be effective December 8, 1994, 19 TexReg 9360; amended to be effective July 8, 1998, 23 TexReg 6973; amended to be effective March 29, 2001, 26 TexReg 2398; amended to be effective September 12, 2002, 27 TexReg 8546; amended to be effective January 6, 2011, 35 TexReg 11909; amended to be effective July 31, 2014, 39 TexReg 5777

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page