§12.330 |
Signs and Markers |
§12.331 |
Casing and Sealing of Drilled Holes: General Requirements |
§12.332 |
Casing and Sealing of Drilled Holes: Temporary |
§12.333 |
Casing and Sealing of Drilled Holes: Permanent |
§12.334 |
Topsoil: General Requirements |
§12.335 |
Topsoil: Removal |
§12.336 |
Topsoil: Storage |
§12.337 |
Topsoil: Redistribution |
§12.338 |
Topsoil: Nutrients and Soil Amendments |
§12.339 |
Hydrologic Balance: General Requirements |
§12.340 |
Hydrologic Balance: Water-Quality Standards and Effluent Limitations |
§12.341 |
Hydrologic Balance: Diversions |
§12.343 |
Hydrologic Balance: Sediment Control Measures |
§12.344 |
Hydrologic Balance: Siltation Structures |
§12.345 |
Hydrologic Balance: Discharge Structures |
§12.346 |
Hydrologic Balance: Acid-Forming and Toxic-Forming Spoil |
§12.347 |
Hydrologic Balance: Permanent and Temporary Impoundments |
§12.348 |
Hydrologic Balance: Ground-Water Protection |
§12.349 |
Hydrologic Balance: Surface-Water Protection |
§12.350 |
Hydrologic Balance: Surface and Ground-Water Monitoring |
§12.351 |
Hydrologic Balance: Transfer of Wells |
§12.352 |
Hydrologic Balance: Water Rights and Replacement |
§12.353 |
Hydrologic Balance: Discharge of Water into an Underground Mine |
§12.354 |
Hydrologic Balance: Postmining Rehabilitation of Sedimentation Ponds, Diversions, Impoundments, and Treatment Facilities |
§12.355 |
Hydrologic Balance: Stream Buffer Zones |
§12.356 |
Coal Recovery |
§12.357 |
Use of Explosives: General Requirements |
§12.358 |
Use of Explosives: Pre-blasting Survey |
§12.359 |
Use of Explosives: Blasting Schedule |
§12.360 |
Use of Explosives: Control of Adverse Effects |
§12.362 |
Use of Explosives: Records of Blasting Operations |
§12.363 |
Disposal of Excess Spoil: General Requirements |
§12.364 |
Disposal of Excess Spoil: Valley Fills |
§12.365 |
Disposal of Excess Spoil: Head-of-Hollow Fills |
§12.366 |
Disposal of Excess Spoil: Durable Rock Fills |
§12.367 |
Protection of Underground Mining |
§12.368 |
Coal Processing Waste Banks: General Requirements |
§12.369 |
Coal Processing Waste Banks: Site Inspection |
§12.370 |
Coal Processing Waste Banks: Water Control Measures |
§12.371 |
Coal Processing Waste Banks: Construction Requirements |
§12.372 |
Coal Processing Waste: Burning |
§12.373 |
Coal Processing Waste: Burned Waste Utilization |
§12.374 |
Coal Processing Waste: Return to Underground Workings |
§12.375 |
Disposal of Noncoal Wastes |
§12.376 |
Coal Mine Waste: Dams and Embankments: General Requirements |
§12.377 |
Coal Mine Waste: Dams and Embankments: Site Preparation |
§12.378 |
Coal Mine Waste: Dams and Embankments: Design and Construction |
§12.380 |
Protection of Fish, Wildlife, and Related Environmental Values |
§12.381 |
Slides and Other Damage |
§12.382 |
Pipelines |
§12.383 |
Contemporaneous Reclamation |
§12.384 |
Backfilling and Grading: General Requirements |
§12.385 |
Backfilling and Grading: General Grading Requirements |
§12.386 |
Backfilling and Grading: Covering Coal and Acid- and Toxic-forming Materials |
§12.387 |
Backfilling and Grading: Thin Overburden |
§12.388 |
Backfilling and Grading: Thick Overburden |
§12.389 |
Stabilization of Surface Areas for Surface Mining |
§12.390 |
Revegetation: General Requirements |
§12.391 |
Revegetation: Use of Introduced Species |
§12.392 |
Revegetation: Timing |
§12.393 |
Revegetation: Mulching and Other Soil Stabilizing Practices |
§12.395 |
Revegetation: Standards for Success |
§12.397 |
Cessation of Operations: Temporary |
§12.398 |
Cessation of Operations: Permanent |
§12.399 |
Postmining Land Use |
§12.400 |
Roads: General |
§12.401 |
Primary Roads |
§12.402 |
Utility Installations |
§12.403 |
Support Facilities |