<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 16ECONOMIC REGULATION
PART 1RAILROAD COMMISSION OF TEXAS
CHAPTER 12COAL MINING REGULATIONS
SUBCHAPTER KPERMANENT PROGRAM PERFORMANCE STANDARDS
DIVISION 3PERMANENT PROGRAM PERFORMANCE STANDARDS--UNDERGROUND MINING ACTIVITIES
RULE §12.537Coal Mine Waste Banks: Water-control Measures

(a) A properly designed subdrainage system shall be provided, which shall:

  (1) intercept all ground-water sources;

  (2) be protected by an adequate filter; and

  (3) be covered so as to protect against the entrance of surface water or leachate from the coal mine waste.

(b) All surface drainage from the area above the coal mine waste bank and from the crest and face of the waste disposal area shall be diverted in accordance with §12.532(e) of this title (relating to Disposal of Underground Development Waste and Excess Spoil: Valley Fills).

(c) Slope protection shall be provided to minimize surface erosion at the site. All disturbed areas, including diversion ditches that are not riprapped, shall be vegetated upon completion of construction.

(d) Discharges of all water from a coal mine waste bank shall comply with §§12.509, 12.510, 12.513, 12.514, 12.519, and 12.522 of this title (relating to Hydrologic Balance: General Requirements, to Hydrologic Balance: Water-Quality Standards and Effluent Limitations, to Hydrologic Balance: Sediment Control Measures, to Hydrologic Balance: Siltation Structures, to Hydrologic Balance: Surface and Ground-Water Monitoring, and to Hydrologic Balance: Discharge of Water Into an Underground Mine).


Source Note: The provisions of this §12.537 adopted to be effective April 7, 1997, 22 TexReg 3093; amended to be effective November 4, 1997, 22 TexReg 10640.

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page