Texas Register Flag
Texas Administrative Code

TITLE 16 ECONOMIC REGULATION
PART 1 RAILROAD COMMISSION OF TEXAS
CHAPTER 12 COAL MINING REGULATIONS
SUBCHAPTER K PERMANENT PROGRAM PERFORMANCE STANDARDS
DIVISION 3 PERMANENT PROGRAM PERFORMANCE STANDARDS--UNDERGROUND MINING ACTIVITIES

Rules

§12.500 Signs and Markers
§12.501 Casing and Sealing of Exposed Underground Openings: General Requirements
§12.502 Casing and Sealing of Underground Openings: Temporary
§12.503 Casing and Sealing of Underground Openings: Permanent
§12.504 Topsoil: General Requirements
§12.505 Topsoil: Removal
§12.506 Topsoil: Storage
§12.507 Topsoil: Redistribution
§12.508 Topsoil: Nutrients and Soil Amendments
§12.509 Hydrologic Balance: General Requirements
§12.510 Hydrologic Balance: Water-Quality Standards and Effluent Limitations
§12.511 Hydrologic Balance: Diversions
§12.513 Hydrologic Balance: Sediment Control Measures
§12.514 Hydrologic Balance: Siltation Structures
§12.515 Hydrologic Balance: Discharge Structures
§12.516 Hydrologic Balance: Acid-Forming and Toxic-Forming Materials
§12.517 Hydrologic Balance: Permanent and Temporary Impoundments
§12.518 Hydrologic Balance: Underground Mine Entry and Access Discharges
§12.519 Hydrologic Balance: Surface and Ground-Water Monitoring
§12.520 Hydrologic Balance: Transfer of Wells
§12.521 Hydrologic Balance: Water Rights and Replacement
§12.522 Hydrologic Balance: Discharge of Water into an Underground Mine
§12.523 Hydrologic Balance: Postmining Rehabilitation of Sedimentation Ponds, Diversions, Impoundments, and Treatment Facilities
§12.524 Hydrologic Balance: Stream Buffer Zones
§12.525 Coal Recovery
§12.526 Use of Explosives: General Requirements
§12.527 Use of Explosives: Pre-Blasting Survey
§12.528 Use of Explosives: Control of Adverse Effects
§12.530 Use of Explosives: Records of Blasting Operations
§12.531 Disposal of Underground Development Waste and Excess Spoil: General Requirements
§12.532 Disposal of Underground Development Waste and Excess Spoil: Valley Fills
§12.533 Disposal of Underground Development Waste and Excess Spoil: Head-of-Hollow Fills
§12.534 Disposal of Underground Development Waste and Excess Spoil: Durable Rock Fills
§12.535 Coal Mine Waste Banks: General Requirements
§12.536 Coal Mine Waste Banks: Site Inspection
§12.537 Coal Mine Waste Banks: Water-control Measures
§12.538 Coal Mine Waste Banks: Construction Requirements
§12.539 Coal Mine Waste: Burning
§12.540 Coal Mine Waste: Burned-Waste Utilization
§12.541 Coal Mine Waste: Return to Underground Workings
§12.542 Disposal of Noncoal Wastes
§12.543 Coal Mine Waste: Dams and Embankments: General Requirements
§12.544 Coal Mine Waste: Dams and Embankments: Site Preparation
§12.545 Coal Mine Waste: Dams and Embankments: Design and Construction
§12.547 Protection of Fish, Wildlife, and Related Environmental Values
§12.548 Slides And Other Damage
§12.549 Pipelines
§12.550 Contemporaneous Reclamation
§12.551 Backfilling and Grading: General Requirements
§12.552 Backfilling and Grading: General Grading Requirements
§12.553 Backfilling and Grading: Covering Coal and Acid- and Toxic-forming Materials
§12.554 Stabilization of Surface Areas for Underground Mining
§12.555 Revegetation: General Requirements
§12.556 Revegetation: Use of Introduced Species
§12.557 Revegetation: Timing
§12.558 Revegetation: Mulching and Other Soil Stabilizing Practices
§12.559 Revegetation: Grazing
§12.560 Revegetation: Standards for Success
§12.562 Subsidence Control: General Requirements
§12.563 Subsidence Control: Public Notice
§12.564 Subsidence Control: Surface-Owner Protection
§12.565 Subsidence Control: Buffer Zones
§12.566 Cessation of Operations: Temporary
§12.567 Cessation of Operations: Permanent
§12.568 Postmining Land Use
§12.569 Roads: General
§12.570 Primary Roads
§12.571 Utility Installations
§12.572 Support Facilities

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page