<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 30ENVIRONMENTAL QUALITY
PART 1TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
CHAPTER 213EDWARDS AQUIFER
SUBCHAPTER AEDWARDS AQUIFER IN MEDINA, BEXAR, COMAL, KINNEY, UVALDE, HAYS, TRAVIS, AND WILLIAMSON COUNTIES
RULE §213.5Required Edwards Aquifer Protection Plans, Notification, and Exemptions

    (G) The technical report must describe the measures that will be used to contain any spill of hydrocarbons or hazardous substances such as on a roadway or from a pipeline or from temporary aboveground storage of 250 gallons or more.

      (i) Temporary storage facilities are those used on site for less than one year.

      (ii) Temporary aboveground storage tank systems of 250 gallons or more cumulative storage capacity must be located a minimum horizontal distance of 150 feet from any domestic, industrial, irrigation, or public water supply well, or other sensitive feature.

  (5) Responsibility for maintenance of permanent BMPs and measures after construction is complete.

    (A) The applicant shall be responsible for maintaining the permanent BMPs after construction until such time as the maintenance obligation is either assumed in writing by another entity having ownership or control of the property (such as without limitation, an owner's association, a new property owner or lessee, a district, or municipality) or the ownership of the property is transferred to the entity. Such entity shall then be responsible for maintenance until another entity assumes such obligations in writing or ownership is transferred.

    (B) A copy of the transfer of responsibility must be filed with the executive director at the appropriate regional office within 30 days of the transfer.

    (C) This paragraph applies to:

      (i) multiple single-family residential developments, multi-family residential; and

      (ii) non-residential developments such as commercial, industrial, institutional, schools, and other sites where regulated activities occur.

(c) Organized sewage collection systems.

  (1) No person may commence rehabilitation or construction related to an existing or new organized sewage collection system on the recharge zone, until final design plans, specifications, and an engineering report, as specified in Chapter 317 of this title (relating to Design Criteria for Sewerage Systems) and appropriate special requirements of this section, have been filed with and approved by the executive director.

  (2) General design of sewage collection systems. Design of new sewage collection systems on the recharge zone must comply with Chapter 317 of this title.

  (3) Special requirements for sewage collection systems. In addition to the requirements in paragraph (2) of this subsection, sewage collection systems on the recharge zone must meet the following special requirements.

    (A) Manhole rehabilitation or construction. All manholes rehabilitated or constructed after March 21, 1990, must be watertight, with watertight rings and covers and must be constructed and tested to meet the requirements of §317.2(c)(5)(H) of this title (relating to Sewage Collection System).

    (B) Piping for gravity and pressurized collection systems. Compliance with the following is required, unless local regulations dictate more stringent standards:

      (i) for gravity collection systems, all PVC pipe must have a Standard Dimension Ratio (SDR) of 35 or less and meet the requirements of §317.2(a) - (c)(4) of this title; and

      (ii) for all pressurized sewer systems, all PVC pipe must have a minimum working pressure rating of 150 pounds per square inch and meet the requirements of §317.2(d)(2) - (4) and §317.3(d)(5) - (7) of this title (relating to Sewage Collection System and Lift Stations).

    (C) Lift station design. Lift stations must be designed and constructed to ensure that bypassing of any sewage does not occur. All lift stations must be designed to meet the requirements of §317.2(d) and §317.3 of this title. A lift station application must include final construction plans and a design report prepared by or under the direct supervision of a Texas licensed professional engineer. All design information must be signed, sealed, and dated by a Texas licensed professional engineer.

    (D) Certification of new sewage collection system lines by a Texas licensed professional engineer. Owners of sewage collection systems must insure that all new gravity sewer system lines having a diameter greater than or equal to six inches and all new force mains are tested for leakage following construction. Such lines must be certified by a Texas licensed professional engineer to meet the appropriate requirements of §317.2 of this title. The engineer must retain copies of all test results which must be made available to the executive director upon request. The engineer must certify in writing that all wastewater lines have passed all required testing to the appropriate regional office within 30 days of test completion and prior to use of the new collection system. Following the completion of the new sewer lines and manholes, they must be tested every five years thereafter in accordance with subparagraph (E) of this paragraph.

    (E) Testing of existing sewer lines. Owners of sewage collection systems must insure that all existing sewer lines having a diameter greater than or equal to six inches, including private service laterals, manholes, and connections, are tested to determine types and locations of structural damage and defects such as offsets, open joints, or cracked or crushed lines that would allow exfiltration to occur. Existing manholes and lift station wet wells must be tested using methods for new structures which are approved by the executive director.

      (i) Testing of all sewage collection systems must be conducted every five years after being put into use. Any sewage collection system in place as of March 21, 1990 must have commenced and completed the first round of five-year testing. Every five years, existing sewage collection systems must be tested to determine types and locations of structural damage and defects such as offsets, open joints, or cracked or crushed lines that would allow exfiltration to occur. These test results must be certified by a Texas licensed professional engineer. The test results must be retained by the plan holder for five years and made available to the executive director upon request. The use of one of the following methods will satisfy the requirements for the five-year testing of existing sewer lines.

        (I) In-place deflection testing must meet the requirements of §317.2(a)(4)(C) of this title. No pipe shall exceed a deflection rate of 5.0%.

        (II) Internal line inspections, using a color television camera to verify that the lines are free of structural damage such as offsets, open joints, or cracked or crushed lines, that would allow exfiltration to occur, are acceptable. The use of black and white television equipment may be used following demonstration to the executive director that an acceptable inspection can be performed as provided in subclause (IV) of this clause.

        (III) In-line smoke testing is acceptable only for the testing of private service laterals.

        (IV) Testing methods other than those listed in this subsection must be approved by the executive director prior to initiating the sewer line testing.

      (ii) Except as otherwise provided in an enforcement order of the commission, as soon as possible, but at least within one year of detecting defects, repairs to the sewage collection system must be completed by the system's owner. However, all leakage must be immediately contained to prevent any discharge to water in the state or pollution of the Edwards Aquifer whether necessary repairs have been completed or not. Leakage is a violation of Texas Water Code, §26.121 and these rules are not intended to excuse such unlawful discharge of waste into or adjacent to water in the state. All repairs must be certified by a Texas licensed professional engineer. Repairs must be tested within 45 days of completion using the methods described in clause (i) of this subparagraph. Results must be submitted to the appropriate regional office within 30 days of testing.

    (F) Blasting for sewer line excavation. Blasting for sewer line excavation must be done in accordance with appropriate criteria established by the National Fire Protection Association. Should such blasting result in damage to an existing or newly completed sewer line or any of its appurtenances, the owner of the sewer system and appurtenances must repair and retest the damaged sewer line and its appurtenances immediately. The use of sand for pipe embedment or backfill in blasted rock is prohibited.

    (G) Sewer line stub outs. New collection system lines must be constructed with stub outs for the connection of anticipated extensions. The location of such stub outs must be marked on the ground such that their location can be easily determined at the time of connection of the proposed extensions. All stub outs must be sealed with a manufactured cap to prevent leakage. Extensions that were not anticipated at the time of original construction or that are to be connected to an existing sewer line not furnished with stub outs must be connected using a manufactured saddle in accordance with accepted plumbing techniques.