<<Prev Rule

Texas Administrative Code

Next Rule>>
TITLE 16ECONOMIC REGULATION
PART 1RAILROAD COMMISSION OF TEXAS
CHAPTER 3OIL AND GAS DIVISION
RULE §3.98Standards for Management of Hazardous Oil and Gas Waste

applicable requirements of subsection (w)(4) of this section (relating to manifest requirements for transporters).

(p) Packaging. Before transporting hazardous oil and gas waste or offering hazardous oil and gas waste for transportation off-site, an LQG or SQG must package the hazardous oil and gas waste in accordance with the applicable DOT packaging regulations set out in 49 CFR, Parts 173, 178, and 179.

(q) Labeling. Before transporting hazardous oil and gas waste or offering hazardous oil and gas waste for transportation off-site, LQGs and SQGs must label each package that contains hazardous oil and gas waste in accordance with the applicable DOT regulations set out in 49 CFR, Part 172.

(r) Marking.

  (1) General. Before transporting hazardous oil and gas waste or offering hazardous oil and gas waste for transportation off-site, LQGs and SQGs must mark each package that contains hazardous oil and gas waste in accordance with the applicable DOT regulations set out in 49 CFR, Part 172.

  (2) Non-Bulk Packaging. Before transporting hazardous oil and gas waste or offering hazardous oil and gas waste for transportation off-site, LQGs and SQGs must mark each package that contains hazardous oil and gas waste and is of a size specified in 40 CFR, §262.32(b) (110 gallons or less), with the following words and information. Such words and information must be displayed in accordance with the applicable requirements of 49 CFR, 172.304. The generator must include his or her name and address and the manifest document number in the appropriate space: HAZARDOUS WASTE--Federal Law Prohibits Improper Disposal. If found, contact the nearest police or public safety authority or the U.S. Environmental Protection Agency. Generator's Name and Address: ____________________ Manifest Document Number: ________________________

(s) Placarding. Before transporting hazardous oil and gas waste or offering hazardous oil and gas waste for transportation off-site, LQGs and SQGs must placard the vehicle or vehicles used to transport such hazardous oil and gas waste, or offer to the initial transporter the appropriate placards. Appropriate placards shall be determined according to DOT regulations set out in 49 CFR, Part 172, Subpart F.

(t) Recordkeeping.

  (1) Waste Determination. Each LQG and SQG shall keep records of any and all test results, waste analyses, or other determinations made in accordance with subsection (e) of this section (relating to hazardous waste determination), for at least three years from the date that the waste was last sent to an authorized facility.

  (2) Annual Reports. A copy of all reports required in subsection (u)(1) of this section (relating to annual reports), shall be retained by the generator for a period of at least three years from the due date of the report.

  (3) Exception Reports. A copy of all reports required under subsection (u)(2) of this section (relating to exception reports), shall be retained by the generator for a period of at least three years from the due date of the report.

  (4) Inspection Reports. A copy of each inspection report required under this section shall be retained by the generator for a period of at least three years from the due date of the report.

  (5) Extension. The periods of record retention specified in subsection (t)(1) - (4) of this section are extended automatically during the course of any unresolved enforcement action regarding the regulated activity or upon request by the commission.

(u) Reporting.

  (1) Annual Reports. Any generator who is classified as an LQG or SQG during any calendar month of a calendar year shall prepare and submit a single copy of an annual report to the commission on the annual reporting form prescribed by the commission, Form H-21. The report shall be filed on or before the first day of March of the following calendar year and shall be accompanied by the fee assessed under the provisions of subsection (z) of this section. The annual report shall contain a certification signed by the generator. The annual report shall cover activities occurring at the generation site during the month(s) of the reporting year that the site was classified as a small or large quantity generation site, and shall include the following information:

    (A) the name of the generator followed by the generator's P-5 operator number in parentheses, the EPA ID number for the generation site, and the address of the generation site or other site-identifying information (such as the lease number, unit number, or T-4 number (in the case of pipelines));

    (B) the calendar year covered by the report;

    (C) the name, EPA ID number, if any, and address for each authorized facility within the United States to which hazardous oil and gas waste was shipped during the year;

    (D) the name and EPA ID number of each transporter used during the year for shipments to an authorized facility within the United States;

    (E) a description, EPA hazardous waste number (from 40 CFR, Part 261, Subpart C or D), United States DOT hazard class, and quantity of each hazardous oil and gas waste shipped to an authorized facility within the United States. This information must be listed by the EPA ID number of each facility to which hazardous oil and gas waste was shipped. If the waste was shipped to an authorized facility that does not have an EPA ID number, the type of facility (reclamation or recycling) must be designated on the report;

    (F) a description of the efforts undertaken during the year to reduce the volume and toxicity of hazardous oil and gas waste generated; and

    (G) a description of the changes in volume and toxicity of hazardous oil and gas waste actually achieved during the year in comparison to previous years, to the extent such information is available.

  (2) Exception Reports.

    (A) An LQG who does not receive a copy of the manifest with the handwritten signature of the owner or operator of the designated facility within 35 days from the date the hazardous oil and gas waste was accepted by the initial transporter for shipment must contact the transporter and, if necessary, the owner or operator of the designated facility to determine the status of the hazardous oil and gas waste shipment.

    (B) An LQG must submit an exception report to the commission if he or she has not received a copy of the manifest with the handwritten signature of the owner or operator of the designated facility within 45 days from the date the hazardous oil and gas waste was accepted by the initial transporter for shipment. The exception report must include:

      (i) a legible copy of the manifest for that shipment of hazardous oil and gas waste for which the generator does not have confirmation of delivery; and

      (ii) a letter signed by the generator explaining the efforts taken to locate the hazardous oil and gas waste and the results of those efforts.

    (C) An SQG who does not receive confirmation of delivery of hazardous oil and gas waste by receipt of a copy of the manifest with the handwritten signature of the owner or operator of the designated facility within 60 days from the date the hazardous oil and gas waste was accepted by the initial transporter for shipment, must submit to the commission an exception report. The exception report must include:

      (i) a legible copy of the manifest for which the generator does not have confirmation of delivery; and

      (ii) a notation, either typed or handwritten, indicating that the generator has not received confirmation of delivery of the shipment to the designated facility.

    (D) In the case of interstate shipments of hazardous oil and gas waste for which a manifest has not been returned within 45 days of acceptance of the hazardous oil and gas waste for shipment by the initial transporter, an LQG or SQG shall notify the appropriate regulatory agency of the state in which the designated facility is located, and the appropriate regulatory agency of each state in which the shipment may have been delivered, that the manifest has not been received. If a state required to be notified under this section has not received interim or final authorization pursuant to the RCRA, the LQG or SQG shall notify the administrator that the manifest has not been returned.

  (3) Additional Reporting. The commission may require any generator of hazardous oil and gas waste to furnish additional reports concerning the quantities and disposition of hazardous oil and gas waste generated.

(v) Additional Requirements Applicable to International Shipments.

  (1) Exports.

    (A) Any person who exports hazardous oil and gas waste to a foreign country must comply with the requirements of 40 CFR, Part 262, Subpart E.

Cont'd...

Next Page Previous Page

Link to Texas Secretary of State Home Page | link to Texas Register home page | link to Texas Administrative Code home page | link to Open Meetings home page