TITLE 16ECONOMIC REGULATION
PART 1RAILROAD COMMISSION OF TEXAS
CHAPTER 3OIL AND GAS DIVISION
RULE §3.106Sour Gas Pipeline Facility Construction Permit

    (B) the full page or pages of the newspaper containing the published notice required under paragraph (2) of this subsection including the name of the paper, the date the notice was published, and the page number.

(f) The published notice of application shall be at least three inches by five inches in size, exclusive of the plat, and shall contain the following:

  (1) the name, business address, and telephone number of the applicant and of the applicant's authorized representative, if any;

  (2) a description of the geographic location of the sour gas pipeline facility and the area of influence, to the extent not clearly identified in the plat required to be published in subsection (f)(4) of this section;

  (3) the following statement, completed as appropriate: "This proposed pipeline facility will transport sour gas that contains 100 parts per million, or more, of hydrogen sulfide. A copy of application forms and a map showing the location of the pipeline is available for public inspection at the offices of the (insert County name) County Clerk, located at the following address: (insert address of County Clerk). Any owner or occupant of land located within the area of influence of the proposed sour gas pipeline facility desiring to protest this application can do so by mailing or otherwise delivering a letter referring to the application (by docket number if available) and stating their desire to protest to: Docket Services, Office of General Counsel, Railroad Commission of Texas, P.O. Box 12967, Austin, Texas 78711-2967. Protests shall be in writing and received by Docket Services not later than (specify 30th day after the first date notice of the application is to be published). The letter shall include the name, address, and telephone number of every person on whose behalf the protest is filed and shall state the reasons each such person believes that he or she is the owner or occupant of property within the area of influence of the proposed pipeline facility. It is recommended that a copy of this notice be included with the letter."; and

  (4) a plat identifying:

    (A) the location of the pipeline facility;

    (B) area of influence;

    (C) north arrow;

    (D) scale;

    (E) geographic subdivisions appropriate for the scale; and

    (F) by inset or otherwise, landmarks or other features such as roads and highways in relation to the proposed route of the sour gas pipeline facility. These landmarks or other features shall be of sufficient detail to allow a person to reasonably ascertain whether an owned or occupied property that is within the area of influence of the proposed sour gas pipeline facility. Examples of acceptable plats are included in this subsection.

Attached Graphic

(g) Protests. Affected persons have standing to file a protest to an application. In the event the final proposed pipeline route is not known at the time of application, any person who owns or occupies real property located within the area of influence identified in the application shall have standing to file a protest to an application. All such protests shall:

  (1) be in writing and filed at the commission no later than the 30th day after the notice is published in a newspaper in the county in which the person filing the protest owns or occupies real property;

  (2) state the name, address, and telephone number of every person on whose behalf the protest is being filed; and

  (3) include a statement of the facts on which the person filing the protest relies to conclude that each person on whose behalf the protest is being filed is an affected person, as defined in subsection (a)(1) of this section.

(h) Division Review.

  (1) Within 14 days of receipt of the application, the commission's designee will provide notice to the applicant that the application is either complete and accepted for filing, or incomplete and specify the additional information required for acceptance. Such notice shall be provided in writing by mail or by electronic mail if the applicant submits with the application a written request that communications regarding application completeness or deficiencies be communicated by electronic mail and provides an accurate electronic mail address. The application shall be completed within 30 days of notification that the application is incomplete or such longer time as may be requested by the applicant, in writing, and approved by the commission's designee. If the application is not completed within the specified time period, the commission's designee shall send notice of intent to deny the application to the applicant. Within ten days of issuance of a notice of intent to deny the application for failure to complete the application, the applicant may request a hearing on the application as it exists at that time. If a request for hearing is not filed within ten days of issuance of a notice of intent to deny the application for failure to complete the application, the application shall be dismissed without prejudice by the commission's designee.

  (2) The commission's designee shall make a written recommendation as to whether the materials to be used in and method of construction and operation of a proposed sour gas pipeline facility comply with the rules and safety standards of the commission if the application is not protested, by the latter of the 14th day after the end of the 30-day protest period or the 14th day after the day notice of a complete application is issued.

  (3) If, pursuant to subsection (i) of this section, a hearing is held, the staff may introduce evidence relating to the materials to be used in and method of construction and operation of a proposed sour gas pipeline facility.

  (4) In determining whether or not the materials to be used in and method of construction and operation of a proposed sour gas pipeline facility comply with the rules and safety standards of the commission, relevant provisions of §3.36 and §3.70 of this title (relating to Oil, Gas, or Geothermal Resource Operation in Hydrogen Sulfide Areas, and Pipeline Permits Required, respectively) shall be considered. If applicable, Chapter 8 of this title (relating to Pipeline Safety Regulations) shall also be considered.

  (5) If no affected person files a protest with the commission by the 30th day after the date notice of application was published, the commission's designee shall either make a written recommendation that the permit be issued, that the permit be granted subject to specific conditions required to ensure compliance with applicable laws and regulations, or that the permit be denied. If the commission's designee recommends that the permit be conditionally granted or be denied, the reasons for such recommendation shall be explained. If the commission's designee recommends that the application be conditionally granted or be denied, the applicant shall have a right to a hearing upon written request received no later than 15 days after the date of issuance of notice of conditional grant or denial.

(i) Hearing.

  (1) A hearing shall be convened to consider an application for a sour gas pipeline construction permit if:

    (A) a protest is timely filed by an affected person;

    (B) a request is timely filed by the applicant; or

    (C) the commission so elects on its own motion.

  (2) The Office of General Counsel shall assign an examiner who shall conduct a hearing in accordance with the procedural requirements of Texas Government Code, Chapter 2001 (the Administrative Procedure Act), and Chapter 1 of this title (relating to the general rules of practice and procedure).

  (3) The commission shall convene a hearing not later than the 60th day after a protest is filed, the applicant submits a request for hearing, or the commission gives notice of intent to convene a hearing on its own motion. If the application is not complete as of the date the request for hearing is filed or notice of hearing issued, the 60-day time period for convening a hearing shall not begin to run until such time as notice of a complete application is issued unless the hearing is held pursuant to the provisions of subsection (h)(1). If the hearing is held pursuant to the provisions of subsection (h)(1), the hearing will be held within 60 days of receipt of a request for hearing.

  (4) In any hearing convened to consider an application, the applicant has the burden of showing that the materials to be used in and method of construction and operation comply with the applicable rules and safety standards adopted by the commission.

(j) Order.

  (1) An order approving an application shall include a finding that the materials to be used in and method of construction and operation of the facility comply with the applicable rules and safety standards adopted by the commission. If an application meets all the requirements of §3.70 of this title, relating to Pipeline Permits Required, including the requirements of §3.36 of this title, relating to Oil, Gas, or Geothermal Resource Operation in Hydrogen Sulfide Areas, the order may approve the certificate of compliance (Form H-9) or grant the pipeline permit or both.

  (2) An order denying an application shall state the reason or reasons for the denial.

  (3) In the case of an application for which a hearing is conducted, the commission will render a decision not later than the 60th day after the date on which the hearing is finally closed.

  (4) If no hearing is held on an application, the commission will render a decision as soon as practicable but not later than the 60th day after the staff prepares its written recommendation in accordance with subsection (h)(2) and (4).


Source Note: The provisions of this §3.106 adopted to be effective May 1, 2000, 25 TexReg 3741; amended to be effective November 24, 2004, 29 TexReg 10728