RULE §3.97Underground Storage of Gas in Salt Formations

      (i) Each emergency shutdown valve shall be capable of activation at each storage well, at the on-site control center if one exists, at the remote control center if one exists, and at a location that is reasonably anticipated to be accessible to emergency response personnel at any facility that does not have an on-site control center that is attended 24 hours per day.

      (ii) Each emergency shutdown valve shall be an automatic fail-closed valve that automatically closes when there is a loss of pneumatic or hydraulic pressure on, or power to, the valve or when the maximum operating pressure under subsection (k) of this section is exceeded.

      (iii) Each emergency shutdown valve shall be closed and opened at least monthly.

      (iv) Each emergency shutdown valve system shall be tested at least twice each calendar year at intervals not to exceed 7 1/2 months. The test shall consist of activating the actuation devices, checking the warning system, and observing the valve closure.

    (C) If an emergency shutdown valve system fails to operate as required, the well shall be immediately shut in until repairs are completed, unless:

      (i) a backup emergency shutdown valve is in operation on the same piping; or

      (ii) an attendant is posted at the well site to provide immediate manual shut-in.

  (3) Gas, brine, and fresh water surface piping.

    (A) Gas surface piping shall be designed for the permitted maximum allowable operating pressure on the hydrocarbon side of the well. For facilities with hazardous materials surface piping under the administrative authority of the Safety Division of the Railroad Commission of Texas, for the purposes of this section, gas surface piping extends from the wellhead emergency shutdown valve to the first pressure regulation device, including a manual, motor-operated, or emergency shutdown valve.

    (B) Brine piping, if any, shall be designed for the maximum brine wellhead pressure and to transport, under emergency conditions, gas to a gas control system if the operator is solution mining while the gas storage well is in active storage service, unless:

      (i) a secondary emergency shutdown valve is in operation on the brine surface piping; and

      (ii) the brine surface piping between the wellhead emergency shutdown valve and the secondary emergency shutdown valve is designed for the permitted maximum allowable operating pressure on the hydrocarbon side of the well.

    (C) Fresh water surface piping, if any, must be equipped with an emergency shutdown valve unless it is:

      (i) disconnected from the wellhead; or

      (ii) connected to the brine surface piping outboard of the wellhead emergency shutdown valve; or

      (iii) designed for the maximum allowable operating pressure on the hydrocarbon side of the well; and has an internal diameter of less than or equal to two inches; and an attendant is posted at the well site to provide immediate manual shut-in when in use.

    (D) Fresh water piping designed for the permitted maximum allowable operating pressure on the hydrocarbon side of the well and with an internal diameter of less than or equal to two inches, is exempt from the requirement that an emergency shutdown valve be separated from the wellhead by a spool no longer than six feet.

  (4) Cavern debrining and solution mining operations.

    (A) Within one year of the effective date of this section, each storage well shall have two or more of the following redundant devices or methods in operation during cavern debrining operations or during solution mining operations that are conducted with gas in storage in the same cavern. These devices are designed to prevent the release of gas into the brine and fresh water systems connected to the well during cavern debrining operations or during solution mining operations that are conducted with gas in storage in the same cavern. Gas release prevention shall consist of at least two of the following redundant devices or methods:

      (i) emergency shutdown valves equipped with pressure sensor switches or transducers set to automatically close emergency shutdown valves on the brine side of the wellhead and on the fresh water piping, if any, in response to preset pressures on the brine and fresh water piping of the well;

      (ii) weep hole(s) on the brine return string in conjunction with a preset pressure sensor switch or transducer on the brine piping that is set to automatically close emergency shutdown valves on the brine side of the wellhead and on the fresh water piping, if any, in response to a preset pressure;

      (iii) a device on the brine return string or brine piping that detects hydrocarbon in the brine by physical or chemical characteristics and that is set to automatically close emergency shutdown valves on the brine side of the wellhead and on the fresh water piping, if any, in response to hydrocarbon detection;

      (iv) an instrument that detects a rapid increase in the brine flow rate indicative of hydrocarbon in the brine and that is set to automatically close emergency shutdown valves on the brine side of the wellhead and on the fresh water piping, if any, in response to a preset flow rate or differential flow rate; or

      (v) an alternative device or method approved by the Commission.

    (B) Solution mining of a cavern may occur while gas is in storage, provided that the injection of fresh water and the injection of gas do not occur simultaneously within the same cavern.

  (5) Leak or fire detectors.

    (A) Within two years of the effective date of this section, a leak or fire detector shall be installed and in operation at each gas storage well and each structurally enclosed compressor site.

    (B) Leak or fire detectors shall be tested twice each calendar year at intervals not to exceed 7 1/2 months, and, when defective, repaired or replaced within 10 days. Leak or fire detectors shall be integrated with warning systems required in paragraph (6)(A) of this subsection.

  (6) Warning systems and alarms.

    (A) Within two years of the effective date of this section, all leak or fire detectors and sensors or methods that actuate the emergency shutdown valve shall be integrated with warning systems that are audible and visible in the control room and at any remote control center. The circuitry shall be designed so that failure of a leak or fire detector to function will activate the warning.

    (B) A manually operated audible alarm shall be installed at each attended storage facility. The alarm shall be audible in areas of the facility where personnel are normally located.

  (7) Emergency response plan. Each storage facility shall submit to the Commission a written emergency response plan. The plan shall address gas releases, fires, fire suppression capability, explosions, loss of electricity, and loss of telecommunication services. The plan shall describe the facility's emergency response communication system, procedures for coordination of emergency communication and response activities with local authorities, use of warning systems, procedures for citizen and employee emergency notification and evacuation, and employee training. The plan shall also include a plat of the facility showing the locations of wells, processing areas, and other significant features at the facility. The initial plan must be designed based upon the existing safety measures at the facility. The plan shall be updated as changes in safety features at the facility occur, or as the Commission or its designee requires. A copy of the plan shall be provided to the local emergency response committee and to any other local governmental entity that submits a written request for a copy of the plan to the operator. Copies of the plan shall also be available at the storage facility and at the company headquarters.

  (8) Notification of emergency or uncontrolled release.

    (A) Emergency response personnel. Each operator shall notify the county sheriff's office, the county emergency management coordinator, and any other appropriate public officials which are identified in the emergency response plan of any emergency that could endanger nearby residents or property. Such emergencies include, but are not limited to, an uncontrolled release of hydrocarbons from a storage well or a leak or fire at any area of the storage facility. The operator shall give notice as soon as practicable following the discovery of the emergency. At the time of the notice, the operator shall also report an assessment of the potential threat to the public.

    (B) Commission. The operator shall report to the appropriate Commission district office as soon as practicable any emergency, significant loss of gas or fluids, significant mechanical failure, or other problem that increases the potential for an uncontrolled release. The operator shall file with the Commission within 30 days of the incident a written report on the root cause of the incident. Within 90 days of the incident, the operator shall file with the Commission a written report that Cont'd...