RULE §3.13Casing, Cementing, Drilling, Well Control, and Completion Requirements

    (A) Conductor casing. A string of new pipe, or reconditioned pipe with substantially the same characteristics as new pipe, shall be set and cemented at a depth of not less than 300 feet TVD (true vertical depth) nor more than 800 feet TVD below the mud line. Sufficient cement shall be used to fill the annular space back of the pipe to the mud line; however, cement may be washed out or displaced to a maximum depth of 50 feet below the mud line to facilitate pipe removal on abandonment. Casing shall be set and cemented in all cases prior to penetration of known shallow oil and gas formations, or upon encountering such formations.

    (B) Surface casing. All surface casing shall be a string of new pipe with a mill test of at least 1,100 pounds per square inch (psi) or reconditioned pipe that has been tested to an equal pressure. Sufficient cement shall be used to fill the annular space behind the pipe to the mud line; however, cement may be washed out or displaced to a maximum depth of 50 feet below the mud line to facilitate pipe removal on abandonment. Surface casing shall be set and cemented in all cases prior to penetration of known shallow oil and gas formations, or upon encountering such formations. In all cases, surface casing shall be set prior to drilling below 3,500 feet TVD. Minimum depths for surface casing are as follows.

      (i) Surface Casing Depth Table.

Attached Graphic

      (ii) Surface Casing test.

        (I) Cement shall be allowed to stand under pressure for a minimum of eight hours before drilling plug or initiating tests. Casing shall be tested by pump pressure to at least 1,000 psi. If, at the end of 30 minutes, the pressure shows a drop of 100 psi or more, the casing shall be condemned until the leak is corrected. A pressure test demonstrating a drop of less than 100 psi after 30 minutes constitutes confirmation that the condition has been corrected.

        (II) After drillout, if the surface casing is exposed to more than 360 rotating hours, the operator shall verify the integrity of the casing using a casing evaluation tool, a mechanical integrity test, or an equivalent Commission-approved alternate casing evaluation methodology, unless otherwise approved by the district director.

        (III) If a mechanical integrity test of the surface casing is conducted, the appropriate district office shall be notified a minimum of eight (8) hours before the test is conducted. The operator shall use a chart of acceptable range (20% - 80% of full scale) or an electronic equivalent approved by the district director, and the surface casing shall be tested at a minimum test pressure of 0.5 psi per foot multiplied by the true vertical depth of the surface casing up to a maximum of 1,500 psi for a minimum of 30 minutes. A pressure test demonstrating less than a 10% drop in pressure after 30 minutes constitutes confirmation of an acceptable pressure test. The operator shall notify the appropriate district office within 24 hours of a failed test. Operations may not re-commence until the district director approves a remediation plan and the operator implements the approved plan, and the operator successfully re-tests the surface casing.

    (C) Production casing or oil string.

      (i) The production casing or oil string shall be new or reconditioned pipe with a mill test of at least 2,000 psi that has been tested to an equal pressure.

      (ii) After cementing, the production casing shall be tested by pump pressure to at least 1,500 psi. If, at the end of 30 minutes, the pressure shows a drop of 150 psi or more, the casing shall be condemned. After corrective operations, the casing shall again be tested in the same manner.

      (iii) Cementing of the production casing shall be by the pump and plug method. Sufficient cement shall be used to fill the calculated annular space above the shoe to isolate any productive zones, potential flow zones, or zones with corrosive formation fluids and to a depth that isolates abnormal pressure from normal pressure (0.465 psi per vertical foot of gradient). A float collar or other means to stop the cement plug shall be inserted in the casing string above the shoe. Cement shall be allowed to stand under pressure for a minimum of eight hours before drilling the plug or initiating tests.

  (2) Operators shall comply with the well control requirements of subsection (a)(6) of this section.

(d) Exceptions or alternate programs. The director may administratively grant an exception or approve an alternate casing/tubing program required by this section provided that the alternate casing/tubing program will achieve the intent of the rule as described in subsection (a)(1) of this section and the following requirements are met:

  (1) The request for an exception or alternate casing/tubing program shall be accompanied by the fee required by §3.78(b)(5) of this title (relating to Fees and Financial Security Requirements).

  (2) An administrative exception for tubing shall not exceed a period of 180 days. A request for an exception for tubing beyond 180 days shall require a Commission order.


Source Note: The provisions of this §3.13 adopted to be effective January 1, 1976; amended to be effective April 8, 1980, 5 TexReg 1152; amended to be effective October 3, 1980, 5 TexReg 3794; amended to be effective January 1, 1983, 7 TexReg 3982; amended to be effective March 10, 1986, 11 TexReg 901; amended to be effective January 11, 1991, 16 TexReg 39; amended to be effective August 13, 1991, 16 TexReg 4153; amended to be effective August 25, 2003, 28 TexReg 6816; amended to be effective January 1, 2014, 38 TexReg 3542