      (v) as otherwise approved by the district director.

    (D) Casing shall be cemented across and above all productive zones, potential flow zones, and/or zones with corrosive formation fluids, as follows:

      (i) if the top of cement is determined through calculation, across and extending at least 600 feet (measured depth) above the zones;

      (ii) if the top of cement is determined through the performance of a temperature survey, across and extending 250 feet (measured depth) above the zones;

      (iii) if the top of cement is determined through the performance of a cement evaluation log, across and extending 100 feet (measured depth) above the zones;

      (iv) across and extending at least 200 feet into the previous casing shoe (or to the surface if the shoe is less than 200 feet from the surface); or

      (v) as otherwise approved by the district director.

    (E) Where necessary, the cement slurry shall be designed to control annular gas migration consistent with, or equivalent to, the standards in API Standard 65-Part 2: Isolating Potential Flow Zones During Well Construction.

  (5) Casing testing before drillout. For surface and intermediate strings of casing, before drilling the cement plug, the operator shall test the casing at a pump pressure in pounds per square inch (psi) calculated by multiplying the length of the true vertical depth in feet of the casing string by a factor of 0.5 psi per foot. The maximum test pressure required, however, unless otherwise ordered by the Commission, need not exceed 1,500 psi. If, at the end of 30 minutes, the pressure shows a drop of 10% or more from the original test pressure, the casing shall be condemned until the leak is corrected. A pressure test demonstrating less than a 10% pressure drop after 30 minutes constitutes confirmation that the condition has been corrected. The operator shall notify the district director of a failed test. In the event of a pressure test failure, completion operations may not re-commence until the district director approves a remediation plan, the operator successfully implements the plan, and the operator conducts a successful pressure test.

  (6) Well control.

    (A) Wellhead assemblies. After setting the conductor pipe on offshore wells or surface casing on land or bay wells, wellhead assemblies shall be used on wells to maintain surface control of the well at all times. Each component of the wellhead shall have a pressure rating equal to or greater than the anticipated pressure to which that particular component might be exposed during the course of drilling, testing, or producing the well.

    (B) Well control equipment.

      (i) An operator shall install a blowout preventer system or control head and other connections to keep the well under control at all times as soon as surface casing is set. When conductor casing is set and/or shallow gas is anticipated to be encountered, operators shall install a diverter system on the conductor casing. For bay and offshore wells, at a minimum, such systems shall include a double ram blowout preventer, including pipe and blind rams, an annular-type blowout preventer or other equivalent control system, and a shear ram.

      (ii) For wells in areas with hydrogen sulfide, the operator shall comply with §3.36 of this title (relating to Oil, Gas, or Geothermal Resource Operation in Hydrogen Sulfide Areas).

      (iii) Ram type blowout prevention equipment shall have a rated working pressure that equals or exceeds the maximum anticipated surface pressure of the well. Blowout preventer rams shall be of a proper size for the drill pipe being used or production casing being run in the well or shall be variable-type rams that are in the appropriate size range. Alternatively, an annular preventer may be used in lieu of casing/pipe rams or variable bore rams when running production casing provided the expected shut-in surface pressures would not exceed the tested pressure rating of the annular preventer.

      (iv) Operators shall install a drill pipe safety valve to prevent backflow of water, oil, gas, or other formation fluids into the drill string.

      (v) Operators shall install a choke line of sufficient size and working pressure.

      (vi) When using a Kelly rig during drilling, the well shall be fitted with an upper Kelly cock in proper working order to close in the drill string below hose and swivel, when necessary for well control. A lower Kelly safety valve shall be installed so that it can be run through the blowout preventer. When needed for well control, the operator shall maintain at all times on the rig floor safety valves to include:

        (I) full-opening safety valve; and

        (II) inside blowout preventer valve with wrenches, handling tools, and necessary subs for all drilling pipe sizes in use.

      (vii) All control equipment shall be consistent with API Standard 53: Recommended Practices for Blowout Prevention Equipment Systems for Drilling Wells. Control equipment shall be certified in accordance with API Standard 53 as operable under the product manufacturer's minimum operational specifications. Certification shall include the proper operation of the closing unit valving, the pressure gauges, and the manufacturer's recommended accumulator fluids. Certification shall be obtained through an independent company that tests blowout preventers, stacks and casings. Certification shall be performed every five (5) years and the proof of certification shall be made available upon request of the Commission.

      (viii) All well control equipment shall be in good working condition at all times. All outlets, fittings, and connections on the casing, blowout preventers, choke manifold, and auxiliary wellhead equipment that may be subjected to wellhead pressure shall be of a material and construction to withstand or exceed the anticipated pressure. The lines from outlets on or below the blowout preventers shall be securely installed, anchored, and protected from damage.

      (ix) In addition to the primary closing system, including an accumulator system, the blowout preventers shall have a secondary location for closure.

      (x) Testing of blowout prevention equipment.

        (I) Ram type blowout prevention equipment shall be tested to at least the maximum anticipated surface pressure of the well, but not less than 1,500 psi, before drilling the plug on the surface casing.

        (II) Blowout prevention equipment shall be tested upon installation, after the disconnection or repair of any pressure containment seal in the blowout preventer stack, choke line, or choke manifold, limited to the affected component, with testing to occur at least every 21 days. When requested, the district director shall be notified before the commencement of a test.

        (III) A record of each test, including test pressures, times, failures, and each mechanical test of the casings, blowout preventers, surface connections, surface fittings, and auxiliary wellhead equipment shall be entered in the logbook, signed by the person responsible for the test, and made available for inspection by the Commission upon request.

    (C) Drilling fluid program.

      (i) The characteristics, use, and testing of drilling fluid and conduct of related drilling procedures shall be designed to prevent the blowout of any well. Adequate supplies of drilling fluid of sufficient weight and other acceptable characteristics shall be maintained. Drilling fluid tests shall be performed as needed to ensure well control. Adequate drilling fluid testing equipment shall be kept on the drilling location at all times. Sufficient drilling fluid shall be pumped and maintained to ensure well control at all times, including when pulling drill pipe. Mud pit levels shall be visually or mechanically monitored during the drilling process. Mud-gas separation equipment shall be installed and operated as needed when abnormally pressured gas-bearing formations may be encountered. The Commission shall have access to the drilling fluid records and shall be allowed to conduct any essential tests on the drilling fluid used in the drilling or recompletion of a well. When the conditions and tests indicate a need for a change in the drilling fluid program in order to insure control of the well, the operator shall use due diligence in modifying the program.

      (ii) Wells drilled with air shall maintain well control using blowout preventer systems and/or diverter systems.

      (iii) All hole intervals drilled prior to reaching the base of protected water shall be drilled with air, fresh water or a fresh water based drilling fluid. No oil-based drilling fluid may be used until casing has been set and cemented to the protection depth.